SOLVING THE DAYS-OFF SCHEDULING PROBLEM USING QUADRATIC PROGRAMMING WITH CIRCULANT MATRIX
The purpose of this paper is the approach of a mathematical model dedicated to planning the consecutive days off of a company’s employees. Companies must find a flexible work schedule between employees, always considering the satisfaction of work tasks as well as guaranteeing consecutive days off. T...
Main Authors: | MORARU, Vasile, ISTRATI, Daniela, ZAPOROJAN, Sergiu |
---|---|
Format: | Article |
Language: | English |
Published: |
Technical University of Moldova
2022-12-01
|
Series: | Journal of Engineering Science (Chişinău) |
Subjects: | |
Online Access: | https://jes.utm.md/wp-content/uploads/sites/20/2023/01/JES-4_2022_97-108.pdf |
Similar Items
-
On–Off Scheduling for Electric Vehicle Charging in Two-Links Charging Stations Using Binary Optimization Approaches
by: Rafał Zdunek, et al.
Published: (2021-10-01) -
The Generalized Trust-Region Sub-Problem with Additional Linear Inequality Constraints—Two Convex Quadratic Relaxations and Strong Duality
by: Temadher A. Almaadeed, et al.
Published: (2020-08-01) -
Binary Quadratic Forms [electronic resource]: An Algorithmic Approach/
by: 402277 Buchmann, Johannes, et al.
Published: (2007) -
A Relaxed and Bound Algorithm Based on Auxiliary Variables for Quadratically Constrained Quadratic Programming Problem
by: Chenyang Hu, et al.
Published: (2022-01-01) -
The PPADMM Method for Solving Quadratic Programming Problems
by: Hai-Long Shen, et al.
Published: (2021-04-01)