Research on Water-Conducting Fractured Zone Height under the Condition of Large Mining Height in Yushen Mining Area, China
AbstractAccurately predicting the development height of the water-conducting fracture zone (HW) is imperative for safe mining in coal mines, in addition to the protection of water resources and the environment. At present, there are relatively few fine-scale zoning studies that speci...
Main Authors: | Dong Feng, Enke Hou, Xiaoshen Xie, Pengfei Hou |
---|---|
Format: | Article |
Language: | English |
Published: |
GeoScienceWorld
2023-01-01
|
Series: | Lithosphere |
Online Access: | https://pubs.geoscienceworld.org/lithosphere/article/2023/1/8918348/619753/Research-on-Water-Conducting-Fractured-Zone-Height |
Similar Items
-
Multi-factor Contribution to the Height of Water-conducting Fracture Zone and Mine Zoning for Water Protection in Yushen Coalfield
by: Shuai ZHANG, et al.
Published: (2023-03-01) -
Characteristic of the water-conducting fracture zone development in thick overburden working face with extra-large mining height in western mining area
by: Zhang Cun, et al.
Published: (2022-06-01) -
Determination of the Height of Overburden Water-Conducting Fracture Zone in 215102 Working Face of Yue Nan Coal Mine
by: Xiangjun Chen, et al.
Published: (2022-01-01) -
Multi-Indicator Early-Warning Model for Mine Water Inrush at the Yushen Mining Area, Shaanxi Province, China
by: Jinxi Liang, et al.
Published: (2023-11-01) -
Height of fractured zone inside overlying strata under high-intensity mining in China
by: Wenbing Guo, et al.
Published: (2019-01-01)