Identification of the main causes of risks in engineering procurement construction projects

Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk...

Full description

Bibliographic Details
Main Authors: Khairullah Noor Hussein, Hilal Mustafa Abdullah, Mohammed Abbas
Format: Article
Language:English
Published: De Gruyter 2022-06-01
Series:Journal of the Mechanical Behavior of Materials
Subjects:
Online Access:https://doi.org/10.1515/jmbm-2022-0029
_version_ 1811203010334818304
author Khairullah Noor Hussein
Hilal Mustafa Abdullah
Mohammed Abbas
author_facet Khairullah Noor Hussein
Hilal Mustafa Abdullah
Mohammed Abbas
author_sort Khairullah Noor Hussein
collection DOAJ
description Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected via well-structured questionnaires addressed to construction sector professionals and preparing lists of main potential risks in EPC/construction projects through reviewing literature studies, books, and articles related to this topic. The findings indicate that several causes of risks are more critical for the project including causes related to contract, design and execution, subcontractors, systems, and equipment. The study’s results revealed that the absence of risk management implementation in the EPC construction project is a root cause of the lack of planning and control of the project.
first_indexed 2024-04-12T02:47:38Z
format Article
id doaj.art-7305e55153a8416a81d7bf28b66dbbb0
institution Directory Open Access Journal
issn 2191-0243
language English
last_indexed 2024-04-12T02:47:38Z
publishDate 2022-06-01
publisher De Gruyter
record_format Article
series Journal of the Mechanical Behavior of Materials
spelling doaj.art-7305e55153a8416a81d7bf28b66dbbb02022-12-22T03:51:06ZengDe GruyterJournal of the Mechanical Behavior of Materials2191-02432022-06-0131128228910.1515/jmbm-2022-0029Identification of the main causes of risks in engineering procurement construction projectsKhairullah Noor Hussein0Hilal Mustafa Abdullah1Mohammed Abbas2Civil Engineering Department, University of Baghdad, Baghdad, IraqCivil Engineering Department, University of Baghdad, Baghdad, IraqCivil Engineering Department, University of Baghdad, Baghdad, IraqMany risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected via well-structured questionnaires addressed to construction sector professionals and preparing lists of main potential risks in EPC/construction projects through reviewing literature studies, books, and articles related to this topic. The findings indicate that several causes of risks are more critical for the project including causes related to contract, design and execution, subcontractors, systems, and equipment. The study’s results revealed that the absence of risk management implementation in the EPC construction project is a root cause of the lack of planning and control of the project.https://doi.org/10.1515/jmbm-2022-0029epcconstruction projectrisksrisk management
spellingShingle Khairullah Noor Hussein
Hilal Mustafa Abdullah
Mohammed Abbas
Identification of the main causes of risks in engineering procurement construction projects
Journal of the Mechanical Behavior of Materials
epc
construction project
risks
risk management
title Identification of the main causes of risks in engineering procurement construction projects
title_full Identification of the main causes of risks in engineering procurement construction projects
title_fullStr Identification of the main causes of risks in engineering procurement construction projects
title_full_unstemmed Identification of the main causes of risks in engineering procurement construction projects
title_short Identification of the main causes of risks in engineering procurement construction projects
title_sort identification of the main causes of risks in engineering procurement construction projects
topic epc
construction project
risks
risk management
url https://doi.org/10.1515/jmbm-2022-0029
work_keys_str_mv AT khairullahnoorhussein identificationofthemaincausesofrisksinengineeringprocurementconstructionprojects
AT hilalmustafaabdullah identificationofthemaincausesofrisksinengineeringprocurementconstructionprojects
AT mohammedabbas identificationofthemaincausesofrisksinengineeringprocurementconstructionprojects