Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Abstract We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacit...
Main Authors: | André Schnabel, Carolin Kellenbrink, Stefan Helber |
---|---|
Format: | Article |
Language: | English |
Published: |
Springer
2018-05-01
|
Series: | Business Research |
Subjects: | |
Online Access: | http://link.springer.com/article/10.1007/s40685-018-0063-5 |
Similar Items
-
A GENETIC ALGORITHM FOR THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP)
by: Edgar Gutiérrez Franco, et al.
Published: (2008-01-01) -
Tracking Predictive Gantt Chart for Proactive Rescheduling in Stochastic Resource Constrained Project Scheduling
by: Mario Brčić, et al.
Published: (2018-12-01) -
An exact solution for the resource-constrained construction scheduling problem
by: Bartłomiej Sroka, et al.
Published: (2016-07-01) -
Solving a new multi-objective resource constrained project scheduling problem by SAICA and compare it with DE method
by: A. Esmaili Dooki, et al.
Published: (2018-09-01) -
Hybrid Variable Neighborhood and Simulated Annealing Heuristic Algorithm to Solve RCPSP
by: Juan Carlos Rivera, et al.
Published: (2013-02-01)