Coordination control for secondary frequency regulation with participation of multiple battery energy storage systems

In the procedure of carbon peaking and carbon neutrality energy revolution, large-scale renewable energy is aggrandizing frequency regulation capacity of power grid. How to make the best use of new rapid resources, represented by battery energy storage systems (BESS), in the secondary frequency regu...

Full description

Bibliographic Details
Main Authors: YU Changhai, PANG Lacheng, WU Jiping, CAO Rongzhang, CHANG Li
Format: Article
Language:zho
Published: Editorial Department of Electric Power Engineering Technology 2024-01-01
Series:电力工程技术
Subjects:
Online Access:https://www.epet-info.com/dlgcjsen/article/abstract/220428609
Description
Summary:In the procedure of carbon peaking and carbon neutrality energy revolution, large-scale renewable energy is aggrandizing frequency regulation capacity of power grid. How to make the best use of new rapid resources, represented by battery energy storage systems (BESS), in the secondary frequency regulation is the key to solve the problem. Firstly, a three-layer frame is designed, embodying area, cluster and plant, which can satisfy the needs for access monitoring and classification decision of various regulation resources in automatic generation control (AGC) system. Secondly, a coordination control strategy including BESS is proposed, and so is the strategy of regulation requirements assignment based on state of charge (SOC) effecting factor in BESS group. Finally, simulations are conducted for continuous disturbance cases from an actual power system, as well as simulations for tripping fault disturbances. The results show that the proposed strategy can improve the SOC consistency between the respective BESS, promoting the availability of BESS, and improve the performance of network frequency response characteristics either.
ISSN:2096-3203