Development of Risk-Reliability Based Underwater Inspection for Fixed Offshore Platforms in Indonesia
In RBUI method, platform with higher risk level will need inspection done more intensively than those with lower risk level. However, the probability of failure (PoF) evaluation in RBUI method is usually carried out in semi quantitative way by comparing failure parameters associated with the same da...
Main Authors: | Tawekal Ricky L., Purnawarman Faisal D., Muliati Yati |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201814705002 |
Similar Items
-
Erratum to: Development of Risk-Realiability Based Underwater Inspection for Fixed Offshore Platforms in Indonesia
by: Tawekal Ricky L., et al.
Published: (2018-01-01) -
Determining Factors of Fixed Offshore Platform Inspections in Indonesia
by: Rizky Bahtiar Sidiq, et al.
Published: (2023-01-01) -
UNDERWATER INSPECTION AND REPAIR FOR OFFSHORE STRUCTURES /
by: Sharp, John V., 1936- , author, et al.
Published: (2021) -
Risk based inspection on fixed offshore jacket structure /
by: 412924 Mohammad Amir Aripin, et al.
Published: (2007) -
Underwater inspection of offshore installations : guidance for designers /
Published: (1978)