PERENCANAAN JUMLAH TOLL GATE

Pasuruan-Probolinggo toll road was built to increase economic sector in East Java Region. Prior to construction, it’s necessary to analyze potential of toll road users and planning the ideal number of toll gates to comply with minimum service standards. This study uses Stated Preference method to de...

Full description

Bibliographic Details
Main Authors: Muhammad Zainul Arifin, Devina Candra Puspita Rini, Khairul Arifin, Ludfi Djakfar
Format: Article
Language:English
Published: University of Brawijaya 2021-02-01
Series:Rekayasa Sipil
Subjects:
Online Access:https://rekayasasipil.ub.ac.id/index.php/rs/article/view/837
_version_ 1818360290717204480
author Muhammad Zainul Arifin
Devina Candra Puspita Rini
Khairul Arifin
Ludfi Djakfar
author_facet Muhammad Zainul Arifin
Devina Candra Puspita Rini
Khairul Arifin
Ludfi Djakfar
author_sort Muhammad Zainul Arifin
collection DOAJ
description Pasuruan-Probolinggo toll road was built to increase economic sector in East Java Region. Prior to construction, it’s necessary to analyze potential of toll road users and planning the ideal number of toll gates to comply with minimum service standards. This study uses Stated Preference method to determine vehicle switch, planning of ideal toll gates using Poisson Distribution, and FIFO queuing model used to analyze toll gate service system. Based on analysis, the largest potential road users who will switch to use Pasuruan-Probolinggo toll road section IV in 2021, 2025, 2030, 2035, and 2040 are 5,49%, 23,84%, 30,63%, 30,63%, and 30,63%. The calculation of toll gates is adjusted to the calculation of potential toll road users in 2025, 2030, 2035, and 2040 with the arrival of 385, 503, 657, and 858 vehicles/hour/strip. So, the ideal number of toll gates needed in 2025-2030, are 4 units, and 2035-2040 are 8 units of toll gates.
first_indexed 2024-12-13T20:58:27Z
format Article
id doaj.art-7424f07a63f84f739de085238f229e50
institution Directory Open Access Journal
issn 1978-5658
2502-6348
language English
last_indexed 2024-12-13T20:58:27Z
publishDate 2021-02-01
publisher University of Brawijaya
record_format Article
series Rekayasa Sipil
spelling doaj.art-7424f07a63f84f739de085238f229e502022-12-21T23:31:40ZengUniversity of BrawijayaRekayasa Sipil1978-56582502-63482021-02-01151515910.21776/ub.rekayasasipil.2021.015.01.8461PERENCANAAN JUMLAH TOLL GATEMuhammad Zainul Arifin0Devina Candra Puspita RiniKhairul ArifinLudfi Djakfar1Universitas BrawijayaUniversitas BrawijayaPasuruan-Probolinggo toll road was built to increase economic sector in East Java Region. Prior to construction, it’s necessary to analyze potential of toll road users and planning the ideal number of toll gates to comply with minimum service standards. This study uses Stated Preference method to determine vehicle switch, planning of ideal toll gates using Poisson Distribution, and FIFO queuing model used to analyze toll gate service system. Based on analysis, the largest potential road users who will switch to use Pasuruan-Probolinggo toll road section IV in 2021, 2025, 2030, 2035, and 2040 are 5,49%, 23,84%, 30,63%, 30,63%, and 30,63%. The calculation of toll gates is adjusted to the calculation of potential toll road users in 2025, 2030, 2035, and 2040 with the arrival of 385, 503, 657, and 858 vehicles/hour/strip. So, the ideal number of toll gates needed in 2025-2030, are 4 units, and 2035-2040 are 8 units of toll gates.https://rekayasasipil.ub.ac.id/index.php/rs/article/view/837stated preferencepotential toll usersqueue modeltoll gates
spellingShingle Muhammad Zainul Arifin
Devina Candra Puspita Rini
Khairul Arifin
Ludfi Djakfar
PERENCANAAN JUMLAH TOLL GATE
Rekayasa Sipil
stated preference
potential toll users
queue model
toll gates
title PERENCANAAN JUMLAH TOLL GATE
title_full PERENCANAAN JUMLAH TOLL GATE
title_fullStr PERENCANAAN JUMLAH TOLL GATE
title_full_unstemmed PERENCANAAN JUMLAH TOLL GATE
title_short PERENCANAAN JUMLAH TOLL GATE
title_sort perencanaan jumlah toll gate
topic stated preference
potential toll users
queue model
toll gates
url https://rekayasasipil.ub.ac.id/index.php/rs/article/view/837
work_keys_str_mv AT muhammadzainularifin perencanaanjumlahtollgate
AT devinacandrapuspitarini perencanaanjumlahtollgate
AT khairularifin perencanaanjumlahtollgate
AT ludfidjakfar perencanaanjumlahtollgate