Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP)

Industrial competition causes companies to be required to increase efficiency, produce quality products and deliver products on time. UMKM Kaana Toraya Coffee is a manufacturing industry that processes Coffee and Food & Beverages. Demand for Kaana Toraya Coffee tends to fluctuate. So a Productio...

Full description

Bibliographic Details
Main Authors: Riyani Indah A. Besse, Pongrekun Kesia, Setiawan Irwan
Format: Article
Language:English
Published: EDP Sciences 2024-01-01
Series:BIO Web of Conferences
Online Access:https://www.bio-conferences.org/articles/bioconf/pdf/2024/15/bioconf_uicat2024_02007.pdf
_version_ 1827302492976709632
author Riyani Indah A. Besse
Pongrekun Kesia
Setiawan Irwan
author_facet Riyani Indah A. Besse
Pongrekun Kesia
Setiawan Irwan
author_sort Riyani Indah A. Besse
collection DOAJ
description Industrial competition causes companies to be required to increase efficiency, produce quality products and deliver products on time. UMKM Kaana Toraya Coffee is a manufacturing industry that processes Coffee and Food & Beverages. Demand for Kaana Toraya Coffee tends to fluctuate. So a Production Plan is needed that is adjusted to production capacity. The aim of this research is to forecast future needs, validate the production plan and design a master production schedule. Forecasting needs using the Weighted Moving Average and Single Exponential Smoothing methods to analyze production plans using the Rough Cut Capacity Planning method with the Bill of Labor. The forecasting results using the Single Exponential Smoothing method with a constant of 0.9 are used as a production plan based on the smallest accuracy. RCCP shows that there is a lack of capacity in the roasting work center. The alternative that was implemented was optimizing the utility of working hours, but there was a lack of capacity, so the second alternative wa to move the workload to the previous period. The Master Production Schedule with RCCP for the period July 2023 to March 2024 in kilograms are 147, 173, 148, 149, 150, 159, 147, 144, and 156.
first_indexed 2024-04-24T16:46:21Z
format Article
id doaj.art-75806ea2fbee4f4faacb99c580d7aed2
institution Directory Open Access Journal
issn 2117-4458
language English
last_indexed 2024-04-24T16:46:21Z
publishDate 2024-01-01
publisher EDP Sciences
record_format Article
series BIO Web of Conferences
spelling doaj.art-75806ea2fbee4f4faacb99c580d7aed22024-03-29T08:28:16ZengEDP SciencesBIO Web of Conferences2117-44582024-01-01960200710.1051/bioconf/20249602007bioconf_uicat2024_02007Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP)Riyani Indah A. Besse0Pongrekun Kesia1Setiawan Irwan2Department of Industrial Engineering, Faculty of Engineering, Hasanuddin UniversityDepartment of Industrial Engineering, Faculty of Engineering, Hasanuddin UniversityDepartment of Industrial Engineering, Faculty of Engineering, Hasanuddin UniversityIndustrial competition causes companies to be required to increase efficiency, produce quality products and deliver products on time. UMKM Kaana Toraya Coffee is a manufacturing industry that processes Coffee and Food & Beverages. Demand for Kaana Toraya Coffee tends to fluctuate. So a Production Plan is needed that is adjusted to production capacity. The aim of this research is to forecast future needs, validate the production plan and design a master production schedule. Forecasting needs using the Weighted Moving Average and Single Exponential Smoothing methods to analyze production plans using the Rough Cut Capacity Planning method with the Bill of Labor. The forecasting results using the Single Exponential Smoothing method with a constant of 0.9 are used as a production plan based on the smallest accuracy. RCCP shows that there is a lack of capacity in the roasting work center. The alternative that was implemented was optimizing the utility of working hours, but there was a lack of capacity, so the second alternative wa to move the workload to the previous period. The Master Production Schedule with RCCP for the period July 2023 to March 2024 in kilograms are 147, 173, 148, 149, 150, 159, 147, 144, and 156.https://www.bio-conferences.org/articles/bioconf/pdf/2024/15/bioconf_uicat2024_02007.pdf
spellingShingle Riyani Indah A. Besse
Pongrekun Kesia
Setiawan Irwan
Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP)
BIO Web of Conferences
title Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP)
title_full Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP)
title_fullStr Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP)
title_full_unstemmed Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP)
title_short Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP)
title_sort arabika coffee production capacity planning with rough cut capacity planning rccp
url https://www.bio-conferences.org/articles/bioconf/pdf/2024/15/bioconf_uicat2024_02007.pdf
work_keys_str_mv AT riyaniindahabesse arabikacoffeeproductioncapacityplanningwithroughcutcapacityplanningrccp
AT pongrekunkesia arabikacoffeeproductioncapacityplanningwithroughcutcapacityplanningrccp
AT setiawanirwan arabikacoffeeproductioncapacityplanningwithroughcutcapacityplanningrccp