Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP)
Industrial competition causes companies to be required to increase efficiency, produce quality products and deliver products on time. UMKM Kaana Toraya Coffee is a manufacturing industry that processes Coffee and Food & Beverages. Demand for Kaana Toraya Coffee tends to fluctuate. So a Productio...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2024-01-01
|
Series: | BIO Web of Conferences |
Online Access: | https://www.bio-conferences.org/articles/bioconf/pdf/2024/15/bioconf_uicat2024_02007.pdf |
_version_ | 1827302492976709632 |
---|---|
author | Riyani Indah A. Besse Pongrekun Kesia Setiawan Irwan |
author_facet | Riyani Indah A. Besse Pongrekun Kesia Setiawan Irwan |
author_sort | Riyani Indah A. Besse |
collection | DOAJ |
description | Industrial competition causes companies to be required to increase efficiency, produce quality products and deliver products on time. UMKM Kaana Toraya Coffee is a manufacturing industry that processes Coffee and Food & Beverages. Demand for Kaana Toraya Coffee tends to fluctuate. So a Production Plan is needed that is adjusted to production capacity. The aim of this research is to forecast future needs, validate the production plan and design a master production schedule. Forecasting needs using the Weighted Moving Average and Single Exponential Smoothing methods to analyze production plans using the Rough Cut Capacity Planning method with the Bill of Labor. The forecasting results using the Single Exponential Smoothing method with a constant of 0.9 are used as a production plan based on the smallest accuracy. RCCP shows that there is a lack of capacity in the roasting work center. The alternative that was implemented was optimizing the utility of working hours, but there was a lack of capacity, so the second alternative wa to move the workload to the previous period. The Master Production Schedule with RCCP for the period July 2023 to March 2024 in kilograms are 147, 173, 148, 149, 150, 159, 147, 144, and 156. |
first_indexed | 2024-04-24T16:46:21Z |
format | Article |
id | doaj.art-75806ea2fbee4f4faacb99c580d7aed2 |
institution | Directory Open Access Journal |
issn | 2117-4458 |
language | English |
last_indexed | 2024-04-24T16:46:21Z |
publishDate | 2024-01-01 |
publisher | EDP Sciences |
record_format | Article |
series | BIO Web of Conferences |
spelling | doaj.art-75806ea2fbee4f4faacb99c580d7aed22024-03-29T08:28:16ZengEDP SciencesBIO Web of Conferences2117-44582024-01-01960200710.1051/bioconf/20249602007bioconf_uicat2024_02007Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP)Riyani Indah A. Besse0Pongrekun Kesia1Setiawan Irwan2Department of Industrial Engineering, Faculty of Engineering, Hasanuddin UniversityDepartment of Industrial Engineering, Faculty of Engineering, Hasanuddin UniversityDepartment of Industrial Engineering, Faculty of Engineering, Hasanuddin UniversityIndustrial competition causes companies to be required to increase efficiency, produce quality products and deliver products on time. UMKM Kaana Toraya Coffee is a manufacturing industry that processes Coffee and Food & Beverages. Demand for Kaana Toraya Coffee tends to fluctuate. So a Production Plan is needed that is adjusted to production capacity. The aim of this research is to forecast future needs, validate the production plan and design a master production schedule. Forecasting needs using the Weighted Moving Average and Single Exponential Smoothing methods to analyze production plans using the Rough Cut Capacity Planning method with the Bill of Labor. The forecasting results using the Single Exponential Smoothing method with a constant of 0.9 are used as a production plan based on the smallest accuracy. RCCP shows that there is a lack of capacity in the roasting work center. The alternative that was implemented was optimizing the utility of working hours, but there was a lack of capacity, so the second alternative wa to move the workload to the previous period. The Master Production Schedule with RCCP for the period July 2023 to March 2024 in kilograms are 147, 173, 148, 149, 150, 159, 147, 144, and 156.https://www.bio-conferences.org/articles/bioconf/pdf/2024/15/bioconf_uicat2024_02007.pdf |
spellingShingle | Riyani Indah A. Besse Pongrekun Kesia Setiawan Irwan Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP) BIO Web of Conferences |
title | Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP) |
title_full | Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP) |
title_fullStr | Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP) |
title_full_unstemmed | Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP) |
title_short | Arabika Coffee Production Capacity Planning with Rough Cut Capacity Planning (RCCP) |
title_sort | arabika coffee production capacity planning with rough cut capacity planning rccp |
url | https://www.bio-conferences.org/articles/bioconf/pdf/2024/15/bioconf_uicat2024_02007.pdf |
work_keys_str_mv | AT riyaniindahabesse arabikacoffeeproductioncapacityplanningwithroughcutcapacityplanningrccp AT pongrekunkesia arabikacoffeeproductioncapacityplanningwithroughcutcapacityplanningrccp AT setiawanirwan arabikacoffeeproductioncapacityplanningwithroughcutcapacityplanningrccp |