Activity networks determine project performance
Abstract Projects are characterised by activity networks with a critical path, a sequence of activities from start to end, that must be finished on time to complete the project on time. Watching over the critical path is the project manager’s strategy to ensure timely project completion. This intens...
Main Authors: | Alexei Vazquez, Iacopo Pozzana, Georgios Kalogridis, Christos Ellinas |
---|---|
Format: | Article |
Language: | English |
Published: |
Nature Portfolio
2023-01-01
|
Series: | Scientific Reports |
Online Access: | https://doi.org/10.1038/s41598-022-27180-0 |
Similar Items
-
Spreading of performance fluctuations on real-world project networks
by: Iacopo Pozzana, et al.
Published: (2021-03-01) -
Mitigation strategies against cascading failures within a project activity network
by: Ellinas, Christos, et al.
Published: (2021) -
Uncovering the fragility of large-scale engineering projects
by: Santolini, Marc, et al.
Published: (2021) -
Uncovering the fragility of large-scale engineering projects
by: Marc Santolini, et al.
Published: (2021-07-01) -
How Robust Is Your Project? From Local Failures to Global Catastrophes: A Complex Networks Approach to Project Systemic Risk.
by: Christos Ellinas, et al.
Published: (2015-01-01)