A new analytical methodology to handle time-cost trade-off problem with considering quality loss cost under interval-valued fuzzy uncertainty
This paper proposes a new framework in addressing time-cost trade-off problem (TCTP) under uncertainty. First critical path analysis is carried out based on developing a new interval-valued fuzzy (IVF)-program evaluation and review technique (PERT) approach. Then, non-conformance risks that influenc...
Main Authors: | Mohammad Hossein Haghighi, Seyed Meysam Mousavi, Jurgita AntucheviÄienÄ—, Vahid Mohagheghi |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
2019-02-01
|
Series: | Technological and Economic Development of Economy |
Subjects: | |
Online Access: | http://localhost/journals.vgtu.lt/index.php/TEDE/article/view/8422 |
Similar Items
-
An Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment
by: Vahid Mohagheghi, et al.
Published: (2017-04-01) -
A Mathematical Model and Two Fuzzy Approaches Based on Credibility and Expected Interval for Project Cost-Quality-Risk Trade-Off Problem in Time-Constrained Conditions
by: Mohammad Hossein Haghighi, et al.
Published: (2022-06-01) -
An optimization model for energy project scheduling problem with cost-risk-quality-social consideration trade-off under uncertainty: A real-world application
by: Mohammad Hossein Haghighi, et al.
Published: (2023-11-01) -
Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach
by: Sayyid Ali Banihashemi, et al.
Published: (2021-08-01) -
Modelling and Solving the Project Time-Cost-quality trade off Problem on Condition of the Dependence of Quality on Time and Cost
by: Abbas Shoul, et al.
Published: (2018-09-01)