Optimal Operation Strategy of Virtual Power Plant Considering Real-Time Dispatch Uncertainty of Distributed Energy Resource Aggregation
Virtual power plant (VPP) technologies continue to develop to embrace various types of distributed energy resources (DERs) that have inherent real-time uncertainty. To prevent side effects on the power system owing to the uncertainty, the VPP should manage its internal resources’ uncertai...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2021-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9400355/ |
_version_ | 1818606484716519424 |
---|---|
author | Jinho Lee Dongjun Won |
author_facet | Jinho Lee Dongjun Won |
author_sort | Jinho Lee |
collection | DOAJ |
description | Virtual power plant (VPP) technologies continue to develop to embrace various types of distributed energy resources (DERs) that have inherent real-time uncertainty. To prevent side effects on the power system owing to the uncertainty, the VPP should manage its internal resources’ uncertainty as a whole. This paper proposes an optimal operation strategy for a VPP participating in day-ahead and real-time energy market so that a distributed energy resource aggregation (DERA) can cope with real-time fluctuation due to uncertainties while achieving its maximum profit. The proposed approach has bidding models of the DERAs including microgrid, electric vehicle aggregation, and demand response aggregation, as well as the VPP. The VPP determines internal prices applied to the DERA by evaluating its real-time responses to the day-ahead schedule and updating proposed pricing function parameters, and the DERA adjusts its energy reserves. By repeating this coordination process, the VPP can establish an optimal operation strategy to manage real-time uncertainty on the DERA’s own. The effectiveness of the proposed strategy is verified by identifying a capability of the DERA to cope with real-time fluctuation through scenario-based simulations. The result shows that the VPP can reduce 1.6% of cost while the internal price applied to the DERA is close to the maximum. |
first_indexed | 2024-12-16T14:11:36Z |
format | Article |
id | doaj.art-76817ce79b5b4a8989d3278fb4c52a89 |
institution | Directory Open Access Journal |
issn | 2169-3536 |
language | English |
last_indexed | 2024-12-16T14:11:36Z |
publishDate | 2021-01-01 |
publisher | IEEE |
record_format | Article |
series | IEEE Access |
spelling | doaj.art-76817ce79b5b4a8989d3278fb4c52a892022-12-21T22:28:44ZengIEEEIEEE Access2169-35362021-01-019569655698310.1109/ACCESS.2021.30725509400355Optimal Operation Strategy of Virtual Power Plant Considering Real-Time Dispatch Uncertainty of Distributed Energy Resource AggregationJinho Lee0https://orcid.org/0000-0002-4150-2221Dongjun Won1https://orcid.org/0000-0001-7906-4864Department of Electrical and Computer Engineering, Inha University, Incheon, South KoreaDepartment of Electrical and Computer Engineering, Inha University, Incheon, South KoreaVirtual power plant (VPP) technologies continue to develop to embrace various types of distributed energy resources (DERs) that have inherent real-time uncertainty. To prevent side effects on the power system owing to the uncertainty, the VPP should manage its internal resources’ uncertainty as a whole. This paper proposes an optimal operation strategy for a VPP participating in day-ahead and real-time energy market so that a distributed energy resource aggregation (DERA) can cope with real-time fluctuation due to uncertainties while achieving its maximum profit. The proposed approach has bidding models of the DERAs including microgrid, electric vehicle aggregation, and demand response aggregation, as well as the VPP. The VPP determines internal prices applied to the DERA by evaluating its real-time responses to the day-ahead schedule and updating proposed pricing function parameters, and the DERA adjusts its energy reserves. By repeating this coordination process, the VPP can establish an optimal operation strategy to manage real-time uncertainty on the DERA’s own. The effectiveness of the proposed strategy is verified by identifying a capability of the DERA to cope with real-time fluctuation through scenario-based simulations. The result shows that the VPP can reduce 1.6% of cost while the internal price applied to the DERA is close to the maximum.https://ieeexplore.ieee.org/document/9400355/Virtual power plantdistributed energy resource aggregationelectricity marketuncertaintyreal-time dispatch |
spellingShingle | Jinho Lee Dongjun Won Optimal Operation Strategy of Virtual Power Plant Considering Real-Time Dispatch Uncertainty of Distributed Energy Resource Aggregation IEEE Access Virtual power plant distributed energy resource aggregation electricity market uncertainty real-time dispatch |
title | Optimal Operation Strategy of Virtual Power Plant Considering Real-Time Dispatch Uncertainty of Distributed Energy Resource Aggregation |
title_full | Optimal Operation Strategy of Virtual Power Plant Considering Real-Time Dispatch Uncertainty of Distributed Energy Resource Aggregation |
title_fullStr | Optimal Operation Strategy of Virtual Power Plant Considering Real-Time Dispatch Uncertainty of Distributed Energy Resource Aggregation |
title_full_unstemmed | Optimal Operation Strategy of Virtual Power Plant Considering Real-Time Dispatch Uncertainty of Distributed Energy Resource Aggregation |
title_short | Optimal Operation Strategy of Virtual Power Plant Considering Real-Time Dispatch Uncertainty of Distributed Energy Resource Aggregation |
title_sort | optimal operation strategy of virtual power plant considering real time dispatch uncertainty of distributed energy resource aggregation |
topic | Virtual power plant distributed energy resource aggregation electricity market uncertainty real-time dispatch |
url | https://ieeexplore.ieee.org/document/9400355/ |
work_keys_str_mv | AT jinholee optimaloperationstrategyofvirtualpowerplantconsideringrealtimedispatchuncertaintyofdistributedenergyresourceaggregation AT dongjunwon optimaloperationstrategyofvirtualpowerplantconsideringrealtimedispatchuncertaintyofdistributedenergyresourceaggregation |