Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British Columbia

The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a combined capacity of 106.7 MW. These HEFs are owned by the Upper Lillooet River Power Li...

Full description

Bibliographic Details
Main Authors: Nichole Boultbee, Oliver Robson, Serge Moalli, Rich Humphries
Format: Article
Language:English
Published: Elsevier 2018-04-01
Series:Engineering
Online Access:http://www.sciencedirect.com/science/article/pii/S2095809918302200
_version_ 1819047201839513600
author Nichole Boultbee
Oliver Robson
Serge Moalli
Rich Humphries
author_facet Nichole Boultbee
Oliver Robson
Serge Moalli
Rich Humphries
author_sort Nichole Boultbee
collection DOAJ
description The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a combined capacity of 106.7 MW. These HEFs are owned by the Upper Lillooet River Power Limited Partnership and the Boulder Creek Power Limited Partnership, and civil and tunnel construction was completed by CRT-ebc. The Upper Lillooet River HEF includes the excavation of a 6 m wide by 5.5 m high and approximately 2500 m long tunnel along the Upper Lillooet River Valley. The project is in a mountainous area; severe restrictions imposed by weather conditions and the presence of sensitive wildlife species constrained the site operations in order to limit environmental impacts. The site is adjacent to the Mount Meager Volcanic Complex, the most recently active volcano in Western Canada. Tunneling conditions were very challenging, including a section through deposits associated with the most recent eruption from Mount Meager Volcanic Complex (∼2360 years before the present). This tunnel section included welded breccia and unconsolidated deposits composed of loose pumice, organics (that represent an old forest floor), and till, before entering the underlying tonalite bedrock. The construction of this section of the tunnel required cover grouting, umbrella support, and excavation with a combination of roadheader, hydraulic hammer, and drilling-and-blasting method. This paper provides an overview of the project, a summary of the key design and construction schedule challenges, and a description of the successful excavation of the tunnel through deposits associated with the recent volcanic activity. Keywords: Run-of-river hydro project, Power tunnel, Umbrella support, Canopy tubes, Volcanic deposits, Pumice, Roadheader, Environmental constraints
first_indexed 2024-12-21T10:56:36Z
format Article
id doaj.art-76b0c70248c941c78cea37e45ab1d404
institution Directory Open Access Journal
issn 2095-8099
language English
last_indexed 2024-12-21T10:56:36Z
publishDate 2018-04-01
publisher Elsevier
record_format Article
series Engineering
spelling doaj.art-76b0c70248c941c78cea37e45ab1d4042022-12-21T19:06:30ZengElsevierEngineering2095-80992018-04-0142260266Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British ColumbiaNichole Boultbee0Oliver Robson1Serge Moalli2Rich Humphries3Golder Associates Ltd., Squamish, British Columbia V8B 0B4, Canada; Corresponding author.Innergex Renewable Energy Inc., Vancouver, British Columbia V6E 4E6, CanadaEBC Inc., North Vancouver, British Columbia V7L 0B5, CanadaGolder Associates Ltd., Squamish, British Columbia V8B 0B4, CanadaThe Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a combined capacity of 106.7 MW. These HEFs are owned by the Upper Lillooet River Power Limited Partnership and the Boulder Creek Power Limited Partnership, and civil and tunnel construction was completed by CRT-ebc. The Upper Lillooet River HEF includes the excavation of a 6 m wide by 5.5 m high and approximately 2500 m long tunnel along the Upper Lillooet River Valley. The project is in a mountainous area; severe restrictions imposed by weather conditions and the presence of sensitive wildlife species constrained the site operations in order to limit environmental impacts. The site is adjacent to the Mount Meager Volcanic Complex, the most recently active volcano in Western Canada. Tunneling conditions were very challenging, including a section through deposits associated with the most recent eruption from Mount Meager Volcanic Complex (∼2360 years before the present). This tunnel section included welded breccia and unconsolidated deposits composed of loose pumice, organics (that represent an old forest floor), and till, before entering the underlying tonalite bedrock. The construction of this section of the tunnel required cover grouting, umbrella support, and excavation with a combination of roadheader, hydraulic hammer, and drilling-and-blasting method. This paper provides an overview of the project, a summary of the key design and construction schedule challenges, and a description of the successful excavation of the tunnel through deposits associated with the recent volcanic activity. Keywords: Run-of-river hydro project, Power tunnel, Umbrella support, Canopy tubes, Volcanic deposits, Pumice, Roadheader, Environmental constraintshttp://www.sciencedirect.com/science/article/pii/S2095809918302200
spellingShingle Nichole Boultbee
Oliver Robson
Serge Moalli
Rich Humphries
Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British Columbia
Engineering
title Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British Columbia
title_full Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British Columbia
title_fullStr Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British Columbia
title_full_unstemmed Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British Columbia
title_short Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British Columbia
title_sort upper lillooet river hydroelectric project the challenges of constructing a power tunnel for run of river hydro projects in mountainous british columbia
url http://www.sciencedirect.com/science/article/pii/S2095809918302200
work_keys_str_mv AT nicholeboultbee upperlillooetriverhydroelectricprojectthechallengesofconstructingapowertunnelforrunofriverhydroprojectsinmountainousbritishcolumbia
AT oliverrobson upperlillooetriverhydroelectricprojectthechallengesofconstructingapowertunnelforrunofriverhydroprojectsinmountainousbritishcolumbia
AT sergemoalli upperlillooetriverhydroelectricprojectthechallengesofconstructingapowertunnelforrunofriverhydroprojectsinmountainousbritishcolumbia
AT richhumphries upperlillooetriverhydroelectricprojectthechallengesofconstructingapowertunnelforrunofriverhydroprojectsinmountainousbritishcolumbia