Displacement Characteristics of Shallow-Buried Large-Section Loess Tunnel with Different Types of Pre-Supports: A Case Study of New Badaling Tunnel

Three-bench seven-step excavation method (TSEM) has been widely used in large-section loess tunnels for high-speed railway in China. As the most commonly applied pre-supports, pipe roofs and leading ductules are broadly used in the ground reinforcement of loess tunnels. Their application is to ensur...

Full description

Bibliographic Details
Main Authors: Daoping Liu, Dingli Zhang, Qian Fang, Zhenyu Sun, Liqiang Cao, Ao Li
Format: Article
Language:English
Published: MDPI AG 2019-12-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/10/1/195
_version_ 1818384558214610944
author Daoping Liu
Dingli Zhang
Qian Fang
Zhenyu Sun
Liqiang Cao
Ao Li
author_facet Daoping Liu
Dingli Zhang
Qian Fang
Zhenyu Sun
Liqiang Cao
Ao Li
author_sort Daoping Liu
collection DOAJ
description Three-bench seven-step excavation method (TSEM) has been widely used in large-section loess tunnels for high-speed railway in China. As the most commonly applied pre-supports, pipe roofs and leading ductules are broadly used in the ground reinforcement of loess tunnels. Their application is to ensure face stability and prevent tunnel collapse during construction. This study focused on the impacts of the TSEM on the ground surface settlement (GSS), as well as the tunnel displacement characteristics for the high-speed railway tunnels with large cross-sections in loess ground. Furthermore, the reinforcement effects of the two kinds of pre-supports were compared in this study. In-situ tests for a total of 12 sections were conducted to reveal the GSSs and displacement characteristics for the shallow-buried large-section loess tunnels. The monitoring results showed that the excavation process plays a significant role on the GSSs and tunnel displacements. A maximum value was observed for the tunnel displacement rate at the excavation of the upper and middle benches, where the face instability or collapse were prone to occur. The GSS trough curves were deviated to the early excavation side, with no conformation to the Gauss distribution. After a series of comparisons, we concluded that the pre-reinforcement effect of the pipe roof is better than that of the leading ductule for the loess tunnels.
first_indexed 2024-12-14T03:24:10Z
format Article
id doaj.art-76b9330a8c094db3b4896664f0906ae4
institution Directory Open Access Journal
issn 2076-3417
language English
last_indexed 2024-12-14T03:24:10Z
publishDate 2019-12-01
publisher MDPI AG
record_format Article
series Applied Sciences
spelling doaj.art-76b9330a8c094db3b4896664f0906ae42022-12-21T23:18:57ZengMDPI AGApplied Sciences2076-34172019-12-0110119510.3390/app10010195app10010195Displacement Characteristics of Shallow-Buried Large-Section Loess Tunnel with Different Types of Pre-Supports: A Case Study of New Badaling TunnelDaoping Liu0Dingli Zhang1Qian Fang2Zhenyu Sun3Liqiang Cao4Ao Li5Key Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, ChinaThree-bench seven-step excavation method (TSEM) has been widely used in large-section loess tunnels for high-speed railway in China. As the most commonly applied pre-supports, pipe roofs and leading ductules are broadly used in the ground reinforcement of loess tunnels. Their application is to ensure face stability and prevent tunnel collapse during construction. This study focused on the impacts of the TSEM on the ground surface settlement (GSS), as well as the tunnel displacement characteristics for the high-speed railway tunnels with large cross-sections in loess ground. Furthermore, the reinforcement effects of the two kinds of pre-supports were compared in this study. In-situ tests for a total of 12 sections were conducted to reveal the GSSs and displacement characteristics for the shallow-buried large-section loess tunnels. The monitoring results showed that the excavation process plays a significant role on the GSSs and tunnel displacements. A maximum value was observed for the tunnel displacement rate at the excavation of the upper and middle benches, where the face instability or collapse were prone to occur. The GSS trough curves were deviated to the early excavation side, with no conformation to the Gauss distribution. After a series of comparisons, we concluded that the pre-reinforcement effect of the pipe roof is better than that of the leading ductule for the loess tunnels.https://www.mdpi.com/2076-3417/10/1/195loess groundlarge-span tunnelthree-bench seven-step excavation methodpre-supportground surface settlementarch settlementhorizontal convergence
spellingShingle Daoping Liu
Dingli Zhang
Qian Fang
Zhenyu Sun
Liqiang Cao
Ao Li
Displacement Characteristics of Shallow-Buried Large-Section Loess Tunnel with Different Types of Pre-Supports: A Case Study of New Badaling Tunnel
Applied Sciences
loess ground
large-span tunnel
three-bench seven-step excavation method
pre-support
ground surface settlement
arch settlement
horizontal convergence
title Displacement Characteristics of Shallow-Buried Large-Section Loess Tunnel with Different Types of Pre-Supports: A Case Study of New Badaling Tunnel
title_full Displacement Characteristics of Shallow-Buried Large-Section Loess Tunnel with Different Types of Pre-Supports: A Case Study of New Badaling Tunnel
title_fullStr Displacement Characteristics of Shallow-Buried Large-Section Loess Tunnel with Different Types of Pre-Supports: A Case Study of New Badaling Tunnel
title_full_unstemmed Displacement Characteristics of Shallow-Buried Large-Section Loess Tunnel with Different Types of Pre-Supports: A Case Study of New Badaling Tunnel
title_short Displacement Characteristics of Shallow-Buried Large-Section Loess Tunnel with Different Types of Pre-Supports: A Case Study of New Badaling Tunnel
title_sort displacement characteristics of shallow buried large section loess tunnel with different types of pre supports a case study of new badaling tunnel
topic loess ground
large-span tunnel
three-bench seven-step excavation method
pre-support
ground surface settlement
arch settlement
horizontal convergence
url https://www.mdpi.com/2076-3417/10/1/195
work_keys_str_mv AT daopingliu displacementcharacteristicsofshallowburiedlargesectionloesstunnelwithdifferenttypesofpresupportsacasestudyofnewbadalingtunnel
AT dinglizhang displacementcharacteristicsofshallowburiedlargesectionloesstunnelwithdifferenttypesofpresupportsacasestudyofnewbadalingtunnel
AT qianfang displacementcharacteristicsofshallowburiedlargesectionloesstunnelwithdifferenttypesofpresupportsacasestudyofnewbadalingtunnel
AT zhenyusun displacementcharacteristicsofshallowburiedlargesectionloesstunnelwithdifferenttypesofpresupportsacasestudyofnewbadalingtunnel
AT liqiangcao displacementcharacteristicsofshallowburiedlargesectionloesstunnelwithdifferenttypesofpresupportsacasestudyofnewbadalingtunnel
AT aoli displacementcharacteristicsofshallowburiedlargesectionloesstunnelwithdifferenttypesofpresupportsacasestudyofnewbadalingtunnel