EVALUASI KEBIJAKAN PERSEDIAAN BAHAN BAKU KANTONG SEMEN UNTUK MENGURANGI BIAYA PERSEDIAAN (Studi Kasus: PT. SOLUSI BANGUN INDONESIA TBK).

Abstract This study aims to evaluate company policy in determining raw material ordering rates which are then compared with the EOQ, POQ, and Min-Max methods. This research uses a quantitive case study method using data obtained from the company. Forecasting is done using WinQSB and MAD, MSE and MA...

Full description

Bibliographic Details
Main Authors: Zahra Zayyina Yustisia Arif (Universitas Pertamina), Iwan Sukarno (Universitas Pertamina)
Format: Article
Language:English
Published: Politeknik APP 2021-01-01
Series:Jurnal Manajemen Industri dan Logistik
Subjects:
Online Access:https://jurnal.poltekapp.ac.id/index.php/JMIL/article/view/510
_version_ 1818458693738430464
author Zahra Zayyina Yustisia Arif (Universitas Pertamina)
Iwan Sukarno (Universitas Pertamina)
author_facet Zahra Zayyina Yustisia Arif (Universitas Pertamina)
Iwan Sukarno (Universitas Pertamina)
author_sort Zahra Zayyina Yustisia Arif (Universitas Pertamina)
collection DOAJ
description Abstract This study aims to evaluate company policy in determining raw material ordering rates which are then compared with the EOQ, POQ, and Min-Max methods. This research uses a quantitive case study method using data obtained from the company. Forecasting is done using WinQSB and MAD, MSE and MAPE software for forecasting accuracy. Based on data processing, the data shows the horizontal pattern and the chosen forecasting method is the Simple Average method. Research shows the EOQ method has an order quantity of 1192 units / order with an order frequency of 11 times a year and has the smallest total inventory cost of the three methods compared which is Rp 269,520,852,781 or almost 50% lower than the total costs incurred by the company using the current method. ROP point has a value of 3395 units with a safety stock value of 106 units. Abstrak Penelitian ini bertujuan untuk mengevaluasi kebijakan perusahaan dalam menentukan tingkat pemesanan bahan baku yang kemudian dibandingkan dengan metode EOQ, POQ dan Min-Max. Penelitian ini menggunakan metode studi kasus kuantitatif dengan menggunakan data yang diperoleh dari perusahaan. Peramalan dilakukan menggunakan perangkat lunak WinQSB dan MAD, MSE dan MAPE untuk akurasi peramalan. Berdasarkan pengolahan data, data menunjukkan pola horizontal dan metode peramalan yang dipilih adalah metode Simple Average. Penelitian ini menunjukkan metode EOQ memiliki jumlah pesanan 1192 unit / pesanan dengan frekuensi pemesanan 11 kali setahun dan memiliki total biaya persediaan terkecil dari ketiga metode yang dibandingkan yaitu Rp 269.520.852 atau hampir 50% lebih rendah dari total biaya yang dikeluarkan oleh perusahaan dengan metode saat ini. Titik ROP memiliki nilai 3395 unit dengan nilai stok pengaman 106 unit.
first_indexed 2024-12-14T23:02:31Z
format Article
id doaj.art-76eed33f0ace4be6a5eef7e51e8ba25d
institution Directory Open Access Journal
issn 2622-528X
2598-5795
language English
last_indexed 2024-12-14T23:02:31Z
publishDate 2021-01-01
publisher Politeknik APP
record_format Article
series Jurnal Manajemen Industri dan Logistik
spelling doaj.art-76eed33f0ace4be6a5eef7e51e8ba25d2022-12-21T22:44:26ZengPoliteknik APPJurnal Manajemen Industri dan Logistik2622-528X2598-57952021-01-014213814510.30988/jmil.v4i2.51066EVALUASI KEBIJAKAN PERSEDIAAN BAHAN BAKU KANTONG SEMEN UNTUK MENGURANGI BIAYA PERSEDIAAN (Studi Kasus: PT. SOLUSI BANGUN INDONESIA TBK).Zahra Zayyina Yustisia Arif (Universitas Pertamina)0Iwan Sukarno (Universitas Pertamina)1Universitas PertaminaUniversitas PertaminaAbstract This study aims to evaluate company policy in determining raw material ordering rates which are then compared with the EOQ, POQ, and Min-Max methods. This research uses a quantitive case study method using data obtained from the company. Forecasting is done using WinQSB and MAD, MSE and MAPE software for forecasting accuracy. Based on data processing, the data shows the horizontal pattern and the chosen forecasting method is the Simple Average method. Research shows the EOQ method has an order quantity of 1192 units / order with an order frequency of 11 times a year and has the smallest total inventory cost of the three methods compared which is Rp 269,520,852,781 or almost 50% lower than the total costs incurred by the company using the current method. ROP point has a value of 3395 units with a safety stock value of 106 units. Abstrak Penelitian ini bertujuan untuk mengevaluasi kebijakan perusahaan dalam menentukan tingkat pemesanan bahan baku yang kemudian dibandingkan dengan metode EOQ, POQ dan Min-Max. Penelitian ini menggunakan metode studi kasus kuantitatif dengan menggunakan data yang diperoleh dari perusahaan. Peramalan dilakukan menggunakan perangkat lunak WinQSB dan MAD, MSE dan MAPE untuk akurasi peramalan. Berdasarkan pengolahan data, data menunjukkan pola horizontal dan metode peramalan yang dipilih adalah metode Simple Average. Penelitian ini menunjukkan metode EOQ memiliki jumlah pesanan 1192 unit / pesanan dengan frekuensi pemesanan 11 kali setahun dan memiliki total biaya persediaan terkecil dari ketiga metode yang dibandingkan yaitu Rp 269.520.852 atau hampir 50% lebih rendah dari total biaya yang dikeluarkan oleh perusahaan dengan metode saat ini. Titik ROP memiliki nilai 3395 unit dengan nilai stok pengaman 106 unit.https://jurnal.poltekapp.ac.id/index.php/JMIL/article/view/510eoq poq min - max forecasting safety stock
spellingShingle Zahra Zayyina Yustisia Arif (Universitas Pertamina)
Iwan Sukarno (Universitas Pertamina)
EVALUASI KEBIJAKAN PERSEDIAAN BAHAN BAKU KANTONG SEMEN UNTUK MENGURANGI BIAYA PERSEDIAAN (Studi Kasus: PT. SOLUSI BANGUN INDONESIA TBK).
Jurnal Manajemen Industri dan Logistik
eoq poq min - max forecasting safety stock
title EVALUASI KEBIJAKAN PERSEDIAAN BAHAN BAKU KANTONG SEMEN UNTUK MENGURANGI BIAYA PERSEDIAAN (Studi Kasus: PT. SOLUSI BANGUN INDONESIA TBK).
title_full EVALUASI KEBIJAKAN PERSEDIAAN BAHAN BAKU KANTONG SEMEN UNTUK MENGURANGI BIAYA PERSEDIAAN (Studi Kasus: PT. SOLUSI BANGUN INDONESIA TBK).
title_fullStr EVALUASI KEBIJAKAN PERSEDIAAN BAHAN BAKU KANTONG SEMEN UNTUK MENGURANGI BIAYA PERSEDIAAN (Studi Kasus: PT. SOLUSI BANGUN INDONESIA TBK).
title_full_unstemmed EVALUASI KEBIJAKAN PERSEDIAAN BAHAN BAKU KANTONG SEMEN UNTUK MENGURANGI BIAYA PERSEDIAAN (Studi Kasus: PT. SOLUSI BANGUN INDONESIA TBK).
title_short EVALUASI KEBIJAKAN PERSEDIAAN BAHAN BAKU KANTONG SEMEN UNTUK MENGURANGI BIAYA PERSEDIAAN (Studi Kasus: PT. SOLUSI BANGUN INDONESIA TBK).
title_sort evaluasi kebijakan persediaan bahan baku kantong semen untuk mengurangi biaya persediaan studi kasus pt solusi bangun indonesia tbk
topic eoq poq min - max forecasting safety stock
url https://jurnal.poltekapp.ac.id/index.php/JMIL/article/view/510
work_keys_str_mv AT zahrazayyinayustisiaarifuniversitaspertamina evaluasikebijakanpersediaanbahanbakukantongsemenuntukmengurangibiayapersediaanstudikasusptsolusibangunindonesiatbk
AT iwansukarnouniversitaspertamina evaluasikebijakanpersediaanbahanbakukantongsemenuntukmengurangibiayapersediaanstudikasusptsolusibangunindonesiatbk