Production Planning Problem of a Two-Level Supply Chain with Production-Time-Dependent Products
This study considers a production planning problem with a two-level supply chain consisting of multiple suppliers and a manufacturing plant. Each supplier that consists of multiple production lines can produce several types of semi-finished products, and the manufacturing plant produces the finished...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-10-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/11/20/9687 |
_version_ | 1797515361605648384 |
---|---|
author | Jun-Hee Han Ju-Yong Lee Bongjoo Jeong |
author_facet | Jun-Hee Han Ju-Yong Lee Bongjoo Jeong |
author_sort | Jun-Hee Han |
collection | DOAJ |
description | This study considers a production planning problem with a two-level supply chain consisting of multiple suppliers and a manufacturing plant. Each supplier that consists of multiple production lines can produce several types of semi-finished products, and the manufacturing plant produces the finished products using the semi-finished products from the suppliers to meet dynamic demands. In the suppliers, different types of semi-finished products can be produced in the same batch, and products in the same batch can only be started simultaneously (at the same time) even if they complete at different times. The purpose of this study is to determine the selection of suppliers and their production lines for the production of semi-finished products for each period of a given planning horizon, and the objective is to minimize total costs associated with the supply chain during the whole planning horizon. To solve this problem, we suggest a mixed integer programming model and a heuristic algorithm. To verify performance of the algorithm, a series of tests are conducted on a number of instances, and the results are presented. |
first_indexed | 2024-03-10T06:44:25Z |
format | Article |
id | doaj.art-7763951223e54ec69b780d81e46f04f0 |
institution | Directory Open Access Journal |
issn | 2076-3417 |
language | English |
last_indexed | 2024-03-10T06:44:25Z |
publishDate | 2021-10-01 |
publisher | MDPI AG |
record_format | Article |
series | Applied Sciences |
spelling | doaj.art-7763951223e54ec69b780d81e46f04f02023-11-22T17:22:38ZengMDPI AGApplied Sciences2076-34172021-10-011120968710.3390/app11209687Production Planning Problem of a Two-Level Supply Chain with Production-Time-Dependent ProductsJun-Hee Han0Ju-Yong Lee1Bongjoo Jeong2Department of Industrial and Management Engineering, Dong-A University, Busan 49315, KoreaDivision of Business Administration & Accounting, Kangwon National University, Chuncheon-si 24341, KoreaDepartment of Business Administration, Kongju National University, Gongju-si 32588, KoreaThis study considers a production planning problem with a two-level supply chain consisting of multiple suppliers and a manufacturing plant. Each supplier that consists of multiple production lines can produce several types of semi-finished products, and the manufacturing plant produces the finished products using the semi-finished products from the suppliers to meet dynamic demands. In the suppliers, different types of semi-finished products can be produced in the same batch, and products in the same batch can only be started simultaneously (at the same time) even if they complete at different times. The purpose of this study is to determine the selection of suppliers and their production lines for the production of semi-finished products for each period of a given planning horizon, and the objective is to minimize total costs associated with the supply chain during the whole planning horizon. To solve this problem, we suggest a mixed integer programming model and a heuristic algorithm. To verify performance of the algorithm, a series of tests are conducted on a number of instances, and the results are presented.https://www.mdpi.com/2076-3417/11/20/9687production planningsupply chainproduction-time-dependent productsheuristicdiscrete production quantity |
spellingShingle | Jun-Hee Han Ju-Yong Lee Bongjoo Jeong Production Planning Problem of a Two-Level Supply Chain with Production-Time-Dependent Products Applied Sciences production planning supply chain production-time-dependent products heuristic discrete production quantity |
title | Production Planning Problem of a Two-Level Supply Chain with Production-Time-Dependent Products |
title_full | Production Planning Problem of a Two-Level Supply Chain with Production-Time-Dependent Products |
title_fullStr | Production Planning Problem of a Two-Level Supply Chain with Production-Time-Dependent Products |
title_full_unstemmed | Production Planning Problem of a Two-Level Supply Chain with Production-Time-Dependent Products |
title_short | Production Planning Problem of a Two-Level Supply Chain with Production-Time-Dependent Products |
title_sort | production planning problem of a two level supply chain with production time dependent products |
topic | production planning supply chain production-time-dependent products heuristic discrete production quantity |
url | https://www.mdpi.com/2076-3417/11/20/9687 |
work_keys_str_mv | AT junheehan productionplanningproblemofatwolevelsupplychainwithproductiontimedependentproducts AT juyonglee productionplanningproblemofatwolevelsupplychainwithproductiontimedependentproducts AT bongjoojeong productionplanningproblemofatwolevelsupplychainwithproductiontimedependentproducts |