Risk-Based Operation and Maintenance Planning of Steam Turbine with the Long In-Service Time

In order to ensure the safety of power generation in Poland and to maintain energy production from coal-fired units with the long in-service time, it is required to develop a strategy for the further operation of the conventional power plants in conditions of increased flexibility. The presented res...

Full description

Bibliographic Details
Main Authors: Martyna Tomala, Andrzej Rusin
Format: Article
Language:English
Published: MDPI AG 2022-07-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/15/14/5019
_version_ 1827597311210946560
author Martyna Tomala
Andrzej Rusin
author_facet Martyna Tomala
Andrzej Rusin
author_sort Martyna Tomala
collection DOAJ
description In order to ensure the safety of power generation in Poland and to maintain energy production from coal-fired units with the long in-service time, it is required to develop a strategy for the further operation of the conventional power plants in conditions of increased flexibility. The presented research focuses on the critical component of the steam turbine, which is the high-pressure rotor. The methodology of the forecasting of crack propagation and growth of life-consumption processes was described, and the probability of a failure in subsequent years was estimated. The development of the identified phenomena depends mainly on the stress increases during start-ups; therefore, these increases were determined to ensure the safety of the turbine’s operation during the assumed period of operation (13 years). The permissible stress for rotor central bore (threatened with crack propagation) was 220 MPa for start-ups which were not carried out “on demand”, and for heat grooves (threatened with life-consumption processes) it was 420 MPa or 210 MPa, depending on the initial wear level of the material. An algorithm for online stress monitoring was presented, taking into account the variability of the heat transfer coefficients. The compiled method can be transformed into a real-time stress level control system. As a result, it is possible to obtain the desired increase in stress during start-up. For a longer service life (20 years), a method of selecting the optimal time interval to carry out preventive actions based on a risk analysis was additionally delineated. The optimal year to perform repair was between the 14th and 15th year of operation. The developed research allows presenting a strategy for further operation and maintenance (O&M) of the turbine, which can be adapted to a real unit.
first_indexed 2024-03-09T03:28:28Z
format Article
id doaj.art-77eec46b4608471eb52323613ef4ecde
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-03-09T03:28:28Z
publishDate 2022-07-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-77eec46b4608471eb52323613ef4ecde2023-12-03T14:58:26ZengMDPI AGEnergies1996-10732022-07-011514501910.3390/en15145019Risk-Based Operation and Maintenance Planning of Steam Turbine with the Long In-Service TimeMartyna Tomala0Andrzej Rusin1Department of Power Engineering and Turbomachinery, Silesian University of Technology, 44-100 Gliwice, PolandDepartment of Power Engineering and Turbomachinery, Silesian University of Technology, 44-100 Gliwice, PolandIn order to ensure the safety of power generation in Poland and to maintain energy production from coal-fired units with the long in-service time, it is required to develop a strategy for the further operation of the conventional power plants in conditions of increased flexibility. The presented research focuses on the critical component of the steam turbine, which is the high-pressure rotor. The methodology of the forecasting of crack propagation and growth of life-consumption processes was described, and the probability of a failure in subsequent years was estimated. The development of the identified phenomena depends mainly on the stress increases during start-ups; therefore, these increases were determined to ensure the safety of the turbine’s operation during the assumed period of operation (13 years). The permissible stress for rotor central bore (threatened with crack propagation) was 220 MPa for start-ups which were not carried out “on demand”, and for heat grooves (threatened with life-consumption processes) it was 420 MPa or 210 MPa, depending on the initial wear level of the material. An algorithm for online stress monitoring was presented, taking into account the variability of the heat transfer coefficients. The compiled method can be transformed into a real-time stress level control system. As a result, it is possible to obtain the desired increase in stress during start-up. For a longer service life (20 years), a method of selecting the optimal time interval to carry out preventive actions based on a risk analysis was additionally delineated. The optimal year to perform repair was between the 14th and 15th year of operation. The developed research allows presenting a strategy for further operation and maintenance (O&M) of the turbine, which can be adapted to a real unit.https://www.mdpi.com/1996-1073/15/14/5019riskO&M strategysteam turbinestress monitoring
spellingShingle Martyna Tomala
Andrzej Rusin
Risk-Based Operation and Maintenance Planning of Steam Turbine with the Long In-Service Time
Energies
risk
O&M strategy
steam turbine
stress monitoring
title Risk-Based Operation and Maintenance Planning of Steam Turbine with the Long In-Service Time
title_full Risk-Based Operation and Maintenance Planning of Steam Turbine with the Long In-Service Time
title_fullStr Risk-Based Operation and Maintenance Planning of Steam Turbine with the Long In-Service Time
title_full_unstemmed Risk-Based Operation and Maintenance Planning of Steam Turbine with the Long In-Service Time
title_short Risk-Based Operation and Maintenance Planning of Steam Turbine with the Long In-Service Time
title_sort risk based operation and maintenance planning of steam turbine with the long in service time
topic risk
O&M strategy
steam turbine
stress monitoring
url https://www.mdpi.com/1996-1073/15/14/5019
work_keys_str_mv AT martynatomala riskbasedoperationandmaintenanceplanningofsteamturbinewiththelonginservicetime
AT andrzejrusin riskbasedoperationandmaintenanceplanningofsteamturbinewiththelonginservicetime