Experience from the Implementation and Operation of the Biological Membrane Reactor (MBR) at the Modernized Wastewater Treatment Plant in Wydminy

Biological membrane reactors or membrane bioreactors (MBRs) based on pressure separation techniques are placed among the latest and most modern methods of wastewater treatment. Currently, this method is becoming more and more popular and is being implemented in smaller and larger wastewater treatmen...

Full description

Bibliographic Details
Main Authors: Iwona Skoczko, Pawel Puzowski, Ewa Szatyłowicz
Format: Article
Language:English
Published: MDPI AG 2020-12-01
Series:Water
Subjects:
Online Access:https://www.mdpi.com/2073-4441/12/12/3410
_version_ 1797545757765533696
author Iwona Skoczko
Pawel Puzowski
Ewa Szatyłowicz
author_facet Iwona Skoczko
Pawel Puzowski
Ewa Szatyłowicz
author_sort Iwona Skoczko
collection DOAJ
description Biological membrane reactors or membrane bioreactors (MBRs) based on pressure separation techniques are placed among the latest and most modern methods of wastewater treatment. Currently, this method is becoming more and more popular and is being implemented in smaller and larger wastewater treatment plants (WWTPs). However, technologists, operators, and managers of small WWTPs often do not understand the MBR technology installed in their sites and need extensive professional and technological information. The aim of this study was to analyze the modernized WWTP in a small town of Wydminy, located in northeastern Poland in the Great Masurian Lakes region, where the traditional secondary settling tank was replaced by an MBR. The effectiveness of wastewater treatment before modernization and after installation of the membrane module was compared. On the basis of the conducted research, it was noted that the operation of the plant after modernization is more cost-intensive. There were additional electricity costs due to ensuring adequate pressure on the membrane. Nevertheless, the obtained results of the removal of contaminants place the plant in Wydminy in the group of the most effective Polish sewage treatment plants, as compared to the results obtained in other facilities. The MBR operation also places high demands on the exploiters, prompting them to observe even the smallest changes. The conducted research is a type of a case study, which could give the readers an understanding of the necessity of traditional WWTP modernization with MBR.
first_indexed 2024-03-10T14:19:29Z
format Article
id doaj.art-780839e6ec934ae3aa313396fcec1bab
institution Directory Open Access Journal
issn 2073-4441
language English
last_indexed 2024-03-10T14:19:29Z
publishDate 2020-12-01
publisher MDPI AG
record_format Article
series Water
spelling doaj.art-780839e6ec934ae3aa313396fcec1bab2023-11-20T23:28:46ZengMDPI AGWater2073-44412020-12-011212341010.3390/w12123410Experience from the Implementation and Operation of the Biological Membrane Reactor (MBR) at the Modernized Wastewater Treatment Plant in WydminyIwona Skoczko0Pawel Puzowski1Ewa Szatyłowicz2Department of Technology in Environmental Engineering, Faculty of Civil and Environmental Science, Bialystok University of Technology, Wiejska 45A, 15-351 Bialystok, PolandDepartment of Technology in Environmental Engineering, Faculty of Civil and Environmental Science, Bialystok University of Technology, Wiejska 45A, 15-351 Bialystok, PolandDepartment of Technology in Environmental Engineering, Faculty of Civil and Environmental Science, Bialystok University of Technology, Wiejska 45A, 15-351 Bialystok, PolandBiological membrane reactors or membrane bioreactors (MBRs) based on pressure separation techniques are placed among the latest and most modern methods of wastewater treatment. Currently, this method is becoming more and more popular and is being implemented in smaller and larger wastewater treatment plants (WWTPs). However, technologists, operators, and managers of small WWTPs often do not understand the MBR technology installed in their sites and need extensive professional and technological information. The aim of this study was to analyze the modernized WWTP in a small town of Wydminy, located in northeastern Poland in the Great Masurian Lakes region, where the traditional secondary settling tank was replaced by an MBR. The effectiveness of wastewater treatment before modernization and after installation of the membrane module was compared. On the basis of the conducted research, it was noted that the operation of the plant after modernization is more cost-intensive. There were additional electricity costs due to ensuring adequate pressure on the membrane. Nevertheless, the obtained results of the removal of contaminants place the plant in Wydminy in the group of the most effective Polish sewage treatment plants, as compared to the results obtained in other facilities. The MBR operation also places high demands on the exploiters, prompting them to observe even the smallest changes. The conducted research is a type of a case study, which could give the readers an understanding of the necessity of traditional WWTP modernization with MBR.https://www.mdpi.com/2073-4441/12/12/3410biological membrane reactors MBRwastewater treatment plantsewage quality
spellingShingle Iwona Skoczko
Pawel Puzowski
Ewa Szatyłowicz
Experience from the Implementation and Operation of the Biological Membrane Reactor (MBR) at the Modernized Wastewater Treatment Plant in Wydminy
Water
biological membrane reactors MBR
wastewater treatment plant
sewage quality
title Experience from the Implementation and Operation of the Biological Membrane Reactor (MBR) at the Modernized Wastewater Treatment Plant in Wydminy
title_full Experience from the Implementation and Operation of the Biological Membrane Reactor (MBR) at the Modernized Wastewater Treatment Plant in Wydminy
title_fullStr Experience from the Implementation and Operation of the Biological Membrane Reactor (MBR) at the Modernized Wastewater Treatment Plant in Wydminy
title_full_unstemmed Experience from the Implementation and Operation of the Biological Membrane Reactor (MBR) at the Modernized Wastewater Treatment Plant in Wydminy
title_short Experience from the Implementation and Operation of the Biological Membrane Reactor (MBR) at the Modernized Wastewater Treatment Plant in Wydminy
title_sort experience from the implementation and operation of the biological membrane reactor mbr at the modernized wastewater treatment plant in wydminy
topic biological membrane reactors MBR
wastewater treatment plant
sewage quality
url https://www.mdpi.com/2073-4441/12/12/3410
work_keys_str_mv AT iwonaskoczko experiencefromtheimplementationandoperationofthebiologicalmembranereactormbratthemodernizedwastewatertreatmentplantinwydminy
AT pawelpuzowski experiencefromtheimplementationandoperationofthebiologicalmembranereactormbratthemodernizedwastewatertreatmentplantinwydminy
AT ewaszatyłowicz experiencefromtheimplementationandoperationofthebiologicalmembranereactormbratthemodernizedwastewatertreatmentplantinwydminy