Research on Reliability Evaluation and Scheme Optimization of Main Connection Mode of Substation

When designing the main wiring scheme of the substation, it is necessary to comprehensively consider the problems of dense power grid, high system stability and outstanding short-circuit current problems, and improve the reliability of power supply according to the actual situation of urban developm...

Full description

Bibliographic Details
Main Authors: Wang Ning, Li Yan, Yang Hongwei, Hu Yuan, Wang Suo
Format: Article
Language:English
Published: EDP Sciences 2020-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/45/e3sconf_iceeb2020_01002.pdf
Description
Summary:When designing the main wiring scheme of the substation, it is necessary to comprehensively consider the problems of dense power grid, high system stability and outstanding short-circuit current problems, and improve the reliability of power supply according to the actual situation of urban development. This design plan optimizes the main wiring form, and conducts optimization research from the three aspects of reliability, flexibility and economy. After technical and economic demonstrations, the optimal design form of the main wiring of the 220kV substation is determined, and it has good economic benefits. The main wiring scheme of 220kV substation with social benefits.