Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and require...

Full description

Bibliographic Details
Main Authors: Kadhim Raheem Erzaij, Dr, Aula Sakban Bidan, MSc student
Format: Article
Language:English
Published: University of Baghdad 2016-06-01
Series:Journal of Engineering
Subjects:
Online Access:http://joe.uobaghdad.edu.iq/index.php/main/article/view/200
_version_ 1797762730077192192
author Kadhim Raheem Erzaij, Dr
Aula Sakban Bidan, MSc student
author_facet Kadhim Raheem Erzaij, Dr
Aula Sakban Bidan, MSc student
author_sort Kadhim Raheem Erzaij, Dr
collection DOAJ
description Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM) as analytical hierarchy process (AHP) have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES) has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.
first_indexed 2024-03-12T19:31:34Z
format Article
id doaj.art-788fa74499ca4385bf51ceeba687c9b5
institution Directory Open Access Journal
issn 1726-4073
2520-3339
language English
last_indexed 2024-03-12T19:31:34Z
publishDate 2016-06-01
publisher University of Baghdad
record_format Article
series Journal of Engineering
spelling doaj.art-788fa74499ca4385bf51ceeba687c9b52023-08-02T04:27:53ZengUniversity of BaghdadJournal of Engineering1726-40732520-33392016-06-01226Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in IraqKadhim Raheem Erzaij, Dr0Aula Sakban Bidan, MSc student1College of Engineering-University of BaghdadCollege of Engineering-University of BaghdadEngineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM) as analytical hierarchy process (AHP) have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES) has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.http://joe.uobaghdad.edu.iq/index.php/main/article/view/200engineering equipment, supplier, construction, AHP, decision maker, model, ESEES, software.
spellingShingle Kadhim Raheem Erzaij, Dr
Aula Sakban Bidan, MSc student
Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
Journal of Engineering
engineering equipment, supplier, construction, AHP, decision maker, model, ESEES, software.
title Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
title_full Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
title_fullStr Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
title_full_unstemmed Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
title_short Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
title_sort management model for evaluation and selection of engineering equipment suppliers for construction projects in iraq
topic engineering equipment, supplier, construction, AHP, decision maker, model, ESEES, software.
url http://joe.uobaghdad.edu.iq/index.php/main/article/view/200
work_keys_str_mv AT kadhimraheemerzaijdr managementmodelforevaluationandselectionofengineeringequipmentsuppliersforconstructionprojectsiniraq
AT aulasakbanbidanmscstudent managementmodelforevaluationandselectionofengineeringequipmentsuppliersforconstructionprojectsiniraq