Feasibility analysis of the implementation of geothermal energy in waters associated for the production of hydrocarbons.
The water-cut or ratio of water to oil is about 92% or higher per day in Colombia. In some oil basins like Los Llanos or Putumayo, the water is extracted with relatively high temperatures that are 115 °C, a potential geothermal resource of low-to-medium enthalpy. Usually,...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universidad Industrial de Santander
2020-12-01
|
Series: | Revista Fuentes El Reventón Energético |
Subjects: | |
Online Access: | https://revistas.uis.edu.co/index.php/revistafuentes/article/view/12446/11557 |
_version_ | 1811219709533618176 |
---|---|
author | Andrea Bohórquez Araque Harold Garavito Reyes |
author_facet | Andrea Bohórquez Araque Harold Garavito Reyes |
author_sort | Andrea Bohórquez Araque |
collection | DOAJ |
description | The water-cut or ratio of water to oil is about 92% or higher per day in Colombia. In some oil basins like Los Llanos or Putumayo, the water is extracted with relatively high temperatures that are 115 °C, a potential geothermal resource of low-to-medium enthalpy. Usually, this hot water is wasted instead of being used as a resource to generate electricity by the Organic Rankine Cycle (ORC) technology. In this paper, an ORC power plant’s technical and economic feasibility analysis is carried out for an oil field with the characteristics mentioned above. The base case for the technical simulation compiles the characteristics and optimal conditions that allow the ORC plant’s proper performance. A sensitivity analysis of mass flow and temperature allows the best working fluid and optimum mass flows to obtain the ORC plant’s best efficiency. As a result, an ORC module with a geothermal fluid input of 30 kg/s and a power output of 1.5 MW is technically feasible. Economically, this module presents an IRR higher than 17% over 8 years.The production of efficient, favorable, and sustainable energy through the development of co-generation projects such as ORC geothermal plants can contribute to an oil field’s energy demand with positive impacts in a noon carbon tax causation. In addition, this type of project also has social impacts facilitating remote communities to access electricity and clean energy. |
first_indexed | 2024-04-12T07:30:27Z |
format | Article |
id | doaj.art-7999326266a94835955817465f120729 |
institution | Directory Open Access Journal |
issn | 1657-6527 2145-8502 |
language | English |
last_indexed | 2024-04-12T07:30:27Z |
publishDate | 2020-12-01 |
publisher | Universidad Industrial de Santander |
record_format | Article |
series | Revista Fuentes El Reventón Energético |
spelling | doaj.art-7999326266a94835955817465f1207292022-12-22T03:42:05ZengUniversidad Industrial de SantanderRevista Fuentes El Reventón Energético1657-65272145-85022020-12-011913343https://doi.org/10.18273/revfue.v19n1-2021004Feasibility analysis of the implementation of geothermal energy in waters associated for the production of hydrocarbons.Andrea Bohórquez Araque0Harold Garavito Reyes1Universidad Industrial de Santander.Universidad Industrial de Santander.The water-cut or ratio of water to oil is about 92% or higher per day in Colombia. In some oil basins like Los Llanos or Putumayo, the water is extracted with relatively high temperatures that are 115 °C, a potential geothermal resource of low-to-medium enthalpy. Usually, this hot water is wasted instead of being used as a resource to generate electricity by the Organic Rankine Cycle (ORC) technology. In this paper, an ORC power plant’s technical and economic feasibility analysis is carried out for an oil field with the characteristics mentioned above. The base case for the technical simulation compiles the characteristics and optimal conditions that allow the ORC plant’s proper performance. A sensitivity analysis of mass flow and temperature allows the best working fluid and optimum mass flows to obtain the ORC plant’s best efficiency. As a result, an ORC module with a geothermal fluid input of 30 kg/s and a power output of 1.5 MW is technically feasible. Economically, this module presents an IRR higher than 17% over 8 years.The production of efficient, favorable, and sustainable energy through the development of co-generation projects such as ORC geothermal plants can contribute to an oil field’s energy demand with positive impacts in a noon carbon tax causation. In addition, this type of project also has social impacts facilitating remote communities to access electricity and clean energy.https://revistas.uis.edu.co/index.php/revistafuentes/article/view/12446/11557low-enthalpy geothermal energyorganic rankine cycleproduction watergeothermal energy. |
spellingShingle | Andrea Bohórquez Araque Harold Garavito Reyes Feasibility analysis of the implementation of geothermal energy in waters associated for the production of hydrocarbons. Revista Fuentes El Reventón Energético low-enthalpy geothermal energy organic rankine cycle production water geothermal energy. |
title | Feasibility analysis of the implementation of geothermal energy in waters associated for the production of hydrocarbons. |
title_full | Feasibility analysis of the implementation of geothermal energy in waters associated for the production of hydrocarbons. |
title_fullStr | Feasibility analysis of the implementation of geothermal energy in waters associated for the production of hydrocarbons. |
title_full_unstemmed | Feasibility analysis of the implementation of geothermal energy in waters associated for the production of hydrocarbons. |
title_short | Feasibility analysis of the implementation of geothermal energy in waters associated for the production of hydrocarbons. |
title_sort | feasibility analysis of the implementation of geothermal energy in waters associated for the production of hydrocarbons |
topic | low-enthalpy geothermal energy organic rankine cycle production water geothermal energy. |
url | https://revistas.uis.edu.co/index.php/revistafuentes/article/view/12446/11557 |
work_keys_str_mv | AT andreabohorquezaraque feasibilityanalysisoftheimplementationofgeothermalenergyinwatersassociatedfortheproductionofhydrocarbons AT haroldgaravitoreyes feasibilityanalysisoftheimplementationofgeothermalenergyinwatersassociatedfortheproductionofhydrocarbons |