Methodology for Existing Railway Reconstruction with Constrained Optimization Based on Point Cloud Data

The reconstruction of an existing railway is important for railway reformation or double-track design. Obtaining the curve parameters of the railway and the location of the main stake accurately and rapidly is the key issue for existing railway reconstruction. A new method based on point cloud data...

Full description

Bibliographic Details
Main Authors: Fei Li, Xiaochun Ren, Wenbing Luo, Xiuwan Chen
Format: Article
Language:English
Published: MDPI AG 2018-10-01
Series:Applied Sciences
Subjects:
Online Access:http://www.mdpi.com/2076-3417/8/10/1782
Description
Summary:The reconstruction of an existing railway is important for railway reformation or double-track design. Obtaining the curve parameters of the railway and the location of the main stake accurately and rapidly is the key issue for existing railway reconstruction. A new method based on point cloud data is proposed in this paper. The issue of reconstruction was transformed into an optimization problem by constructing the objective function and introducing the constraint. With consideration of the slope of the curves’ chord, the robust local weighted moving average method was used for de-noising. The time complexity was reduced greatly after separating the curve unit. The proposed method can obtain the coordinates of the main stake and the parameters of the railway by particle swarm optimization using a full direction search, combining the design requirements and geometric relations of the railway. Finally, some experiments on the design data and measured data were conducted to verify the validity of the proposed method. The results also show that the proposed method is very effective and useful for existing railway reconstruction.
ISSN:2076-3417