Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory
Chen-Mao Liao,1,* Chih-Ming Lin,2,* Chin-Chia Kuo,1 Ming-Shu Chen,3 Chun-Yang Huang,4 Ching-Yuan Lin4 1Department of Applied Statistics and Information Science, Ming Chuan University, Taoyuan City 33352, Taiwan; R.O.C.; 2Department of Healthcare Information and Management, Ming Chuan University, Tao...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Dove Medical Press
2020-12-01
|
Series: | Risk Management and Healthcare Policy |
Subjects: | |
Online Access: | https://www.dovepress.com/adjusting-quality-control-chart-limits-for-wbc-rbc-hb-and-plt-counts-t-peer-reviewed-article-RMHP |
_version_ | 1829507140101865472 |
---|---|
author | Liao CM Lin CM Kuo CC Chen MS Huang CY Lin CY |
author_facet | Liao CM Lin CM Kuo CC Chen MS Huang CY Lin CY |
author_sort | Liao CM |
collection | DOAJ |
description | Chen-Mao Liao,1,* Chih-Ming Lin,2,* Chin-Chia Kuo,1 Ming-Shu Chen,3 Chun-Yang Huang,4 Ching-Yuan Lin4 1Department of Applied Statistics and Information Science, Ming Chuan University, Taoyuan City 33352, Taiwan; R.O.C.; 2Department of Healthcare Information and Management, Ming Chuan University, Taoyuan City 33352, Taiwan; R.O.C.; 3Department of Healthcare Administration, College of Management and Healthcare, Oriental Institute of Technology, New Taipei City 22061, Taiwan; R.O.C.; 4Department of Laboratory Medicine, Ten Chan General Hospital, Chung-Li, Taoyuan City 32043, Taiwan; R.O.C.*These authors contributed equally to this workCorrespondence: Ming-Shu ChenDepartment of Healthcare Administration, College of Management and Healthcare, Oriental Institute of Technology, No58, Sec. 2, Sichuan Road, Pan-Chiao Dist., New Taipei City 22061, Taiwan; R.O.C.Tel +886-2-77388000 ext. 6223Email tree1013@gmail.comBackground: To continuously improve medical quality and provide clinicians with more accurate blood test reports, this study collected blood quality control data in 2017 from a medical examination laboratory in a teaching level hospital located in Taoyuan City, Taiwan.Material and Methods: The quality control data were arranged and analyzed from daily complete blood count (CBC), including white blood cells (WBC), red blood cells (RBC), hemoglobin (Hb), and platelets (PLT) recorded by a laboratory blood analyzer. Using the empirical Bayesian method, we estimated the variation of concentrations of the last and current batches to establish a novel control chart with adjusted upper and lower limits for the current batch, and then compared results with the traditional Shewhart method. The average run length (ARL) and sensitivity of the empirical Bayesian method were explored.Results: The study found that ARL showed a qualified capability for the four blood routine tests when using the empirical Bayesian method. Compared to the Levey–Jennings control chart, the novel control chart presents an alert earlier when a deviation occurs and shows a fake alert later when there is no deviation.Conclusion: The parallel tests showed that the longer the time is, the better the test’s proficiency. We concluded that the empirical Bayesian method could be applied effectively to improve the capability of daily control in CBC laboratory tests.Keywords: empirical Bayesian, EB, average run length, ARL, complete blood count, CBC, Levey–Jennings control chart |
first_indexed | 2024-12-16T11:02:12Z |
format | Article |
id | doaj.art-7a718bc4240c4c3e874a8b0df5bd068a |
institution | Directory Open Access Journal |
issn | 1179-1594 |
language | English |
last_indexed | 2024-12-16T11:02:12Z |
publishDate | 2020-12-01 |
publisher | Dove Medical Press |
record_format | Article |
series | Risk Management and Healthcare Policy |
spelling | doaj.art-7a718bc4240c4c3e874a8b0df5bd068a2022-12-21T22:33:58ZengDove Medical PressRisk Management and Healthcare Policy1179-15942020-12-01Volume 133039304960468Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital LaboratoryLiao CMLin CMKuo CCChen MSHuang CYLin CYChen-Mao Liao,1,* Chih-Ming Lin,2,* Chin-Chia Kuo,1 Ming-Shu Chen,3 Chun-Yang Huang,4 Ching-Yuan Lin4 1Department of Applied Statistics and Information Science, Ming Chuan University, Taoyuan City 33352, Taiwan; R.O.C.; 2Department of Healthcare Information and Management, Ming Chuan University, Taoyuan City 33352, Taiwan; R.O.C.; 3Department of Healthcare Administration, College of Management and Healthcare, Oriental Institute of Technology, New Taipei City 22061, Taiwan; R.O.C.; 4Department of Laboratory Medicine, Ten Chan General Hospital, Chung-Li, Taoyuan City 32043, Taiwan; R.O.C.*These authors contributed equally to this workCorrespondence: Ming-Shu ChenDepartment of Healthcare Administration, College of Management and Healthcare, Oriental Institute of Technology, No58, Sec. 2, Sichuan Road, Pan-Chiao Dist., New Taipei City 22061, Taiwan; R.O.C.Tel +886-2-77388000 ext. 6223Email tree1013@gmail.comBackground: To continuously improve medical quality and provide clinicians with more accurate blood test reports, this study collected blood quality control data in 2017 from a medical examination laboratory in a teaching level hospital located in Taoyuan City, Taiwan.Material and Methods: The quality control data were arranged and analyzed from daily complete blood count (CBC), including white blood cells (WBC), red blood cells (RBC), hemoglobin (Hb), and platelets (PLT) recorded by a laboratory blood analyzer. Using the empirical Bayesian method, we estimated the variation of concentrations of the last and current batches to establish a novel control chart with adjusted upper and lower limits for the current batch, and then compared results with the traditional Shewhart method. The average run length (ARL) and sensitivity of the empirical Bayesian method were explored.Results: The study found that ARL showed a qualified capability for the four blood routine tests when using the empirical Bayesian method. Compared to the Levey–Jennings control chart, the novel control chart presents an alert earlier when a deviation occurs and shows a fake alert later when there is no deviation.Conclusion: The parallel tests showed that the longer the time is, the better the test’s proficiency. We concluded that the empirical Bayesian method could be applied effectively to improve the capability of daily control in CBC laboratory tests.Keywords: empirical Bayesian, EB, average run length, ARL, complete blood count, CBC, Levey–Jennings control charthttps://www.dovepress.com/adjusting-quality-control-chart-limits-for-wbc-rbc-hb-and-plt-counts-t-peer-reviewed-article-RMHPempirical bayesianebaverage run lengtharlcomplete blood countcbclevey–jennings control chart |
spellingShingle | Liao CM Lin CM Kuo CC Chen MS Huang CY Lin CY Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory Risk Management and Healthcare Policy empirical bayesian eb average run length arl complete blood count cbc levey–jennings control chart |
title | Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory |
title_full | Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory |
title_fullStr | Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory |
title_full_unstemmed | Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory |
title_short | Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory |
title_sort | adjusting quality control chart limits for wbc rbc hb and plt counts to reduce daily control risks in hospital laboratory |
topic | empirical bayesian eb average run length arl complete blood count cbc levey–jennings control chart |
url | https://www.dovepress.com/adjusting-quality-control-chart-limits-for-wbc-rbc-hb-and-plt-counts-t-peer-reviewed-article-RMHP |
work_keys_str_mv | AT liaocm adjustingqualitycontrolchartlimitsforwbcrbchbandpltcountstoreducedailycontrolrisksinhospitallaboratory AT lincm adjustingqualitycontrolchartlimitsforwbcrbchbandpltcountstoreducedailycontrolrisksinhospitallaboratory AT kuocc adjustingqualitycontrolchartlimitsforwbcrbchbandpltcountstoreducedailycontrolrisksinhospitallaboratory AT chenms adjustingqualitycontrolchartlimitsforwbcrbchbandpltcountstoreducedailycontrolrisksinhospitallaboratory AT huangcy adjustingqualitycontrolchartlimitsforwbcrbchbandpltcountstoreducedailycontrolrisksinhospitallaboratory AT lincy adjustingqualitycontrolchartlimitsforwbcrbchbandpltcountstoreducedailycontrolrisksinhospitallaboratory |