Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory

Chen-Mao Liao,1,* Chih-Ming Lin,2,* Chin-Chia Kuo,1 Ming-Shu Chen,3 Chun-Yang Huang,4 Ching-Yuan Lin4 1Department of Applied Statistics and Information Science, Ming Chuan University, Taoyuan City 33352, Taiwan; R.O.C.; 2Department of Healthcare Information and Management, Ming Chuan University, Tao...

Full description

Bibliographic Details
Main Authors: Liao CM, Lin CM, Kuo CC, Chen MS, Huang CY, Lin CY
Format: Article
Language:English
Published: Dove Medical Press 2020-12-01
Series:Risk Management and Healthcare Policy
Subjects:
Online Access:https://www.dovepress.com/adjusting-quality-control-chart-limits-for-wbc-rbc-hb-and-plt-counts-t-peer-reviewed-article-RMHP
_version_ 1829507140101865472
author Liao CM
Lin CM
Kuo CC
Chen MS
Huang CY
Lin CY
author_facet Liao CM
Lin CM
Kuo CC
Chen MS
Huang CY
Lin CY
author_sort Liao CM
collection DOAJ
description Chen-Mao Liao,1,* Chih-Ming Lin,2,* Chin-Chia Kuo,1 Ming-Shu Chen,3 Chun-Yang Huang,4 Ching-Yuan Lin4 1Department of Applied Statistics and Information Science, Ming Chuan University, Taoyuan City 33352, Taiwan; R.O.C.; 2Department of Healthcare Information and Management, Ming Chuan University, Taoyuan City 33352, Taiwan; R.O.C.; 3Department of Healthcare Administration, College of Management and Healthcare, Oriental Institute of Technology, New Taipei City 22061, Taiwan; R.O.C.; 4Department of Laboratory Medicine, Ten Chan General Hospital, Chung-Li, Taoyuan City 32043, Taiwan; R.O.C.*These authors contributed equally to this workCorrespondence: Ming-Shu ChenDepartment of Healthcare Administration, College of Management and Healthcare, Oriental Institute of Technology, No58, Sec. 2, Sichuan Road, Pan-Chiao Dist., New Taipei City 22061, Taiwan; R.O.C.Tel +886-2-77388000 ext. 6223Email tree1013@gmail.comBackground: To continuously improve medical quality and provide clinicians with more accurate blood test reports, this study collected blood quality control data in 2017 from a medical examination laboratory in a teaching level hospital located in Taoyuan City, Taiwan.Material and Methods: The quality control data were arranged and analyzed from daily complete blood count (CBC), including white blood cells (WBC), red blood cells (RBC), hemoglobin (Hb), and platelets (PLT) recorded by a laboratory blood analyzer. Using the empirical Bayesian method, we estimated the variation of concentrations of the last and current batches to establish a novel control chart with adjusted upper and lower limits for the current batch, and then compared results with the traditional Shewhart method. The average run length (ARL) and sensitivity of the empirical Bayesian method were explored.Results: The study found that ARL showed a qualified capability for the four blood routine tests when using the empirical Bayesian method. Compared to the Levey–Jennings control chart, the novel control chart presents an alert earlier when a deviation occurs and shows a fake alert later when there is no deviation.Conclusion: The parallel tests showed that the longer the time is, the better the test’s proficiency. We concluded that the empirical Bayesian method could be applied effectively to improve the capability of daily control in CBC laboratory tests.Keywords: empirical Bayesian, EB, average run length, ARL, complete blood count, CBC, Levey–Jennings control chart
first_indexed 2024-12-16T11:02:12Z
format Article
id doaj.art-7a718bc4240c4c3e874a8b0df5bd068a
institution Directory Open Access Journal
issn 1179-1594
language English
last_indexed 2024-12-16T11:02:12Z
publishDate 2020-12-01
publisher Dove Medical Press
record_format Article
series Risk Management and Healthcare Policy
spelling doaj.art-7a718bc4240c4c3e874a8b0df5bd068a2022-12-21T22:33:58ZengDove Medical PressRisk Management and Healthcare Policy1179-15942020-12-01Volume 133039304960468Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital LaboratoryLiao CMLin CMKuo CCChen MSHuang CYLin CYChen-Mao Liao,1,* Chih-Ming Lin,2,* Chin-Chia Kuo,1 Ming-Shu Chen,3 Chun-Yang Huang,4 Ching-Yuan Lin4 1Department of Applied Statistics and Information Science, Ming Chuan University, Taoyuan City 33352, Taiwan; R.O.C.; 2Department of Healthcare Information and Management, Ming Chuan University, Taoyuan City 33352, Taiwan; R.O.C.; 3Department of Healthcare Administration, College of Management and Healthcare, Oriental Institute of Technology, New Taipei City 22061, Taiwan; R.O.C.; 4Department of Laboratory Medicine, Ten Chan General Hospital, Chung-Li, Taoyuan City 32043, Taiwan; R.O.C.*These authors contributed equally to this workCorrespondence: Ming-Shu ChenDepartment of Healthcare Administration, College of Management and Healthcare, Oriental Institute of Technology, No58, Sec. 2, Sichuan Road, Pan-Chiao Dist., New Taipei City 22061, Taiwan; R.O.C.Tel +886-2-77388000 ext. 6223Email tree1013@gmail.comBackground: To continuously improve medical quality and provide clinicians with more accurate blood test reports, this study collected blood quality control data in 2017 from a medical examination laboratory in a teaching level hospital located in Taoyuan City, Taiwan.Material and Methods: The quality control data were arranged and analyzed from daily complete blood count (CBC), including white blood cells (WBC), red blood cells (RBC), hemoglobin (Hb), and platelets (PLT) recorded by a laboratory blood analyzer. Using the empirical Bayesian method, we estimated the variation of concentrations of the last and current batches to establish a novel control chart with adjusted upper and lower limits for the current batch, and then compared results with the traditional Shewhart method. The average run length (ARL) and sensitivity of the empirical Bayesian method were explored.Results: The study found that ARL showed a qualified capability for the four blood routine tests when using the empirical Bayesian method. Compared to the Levey–Jennings control chart, the novel control chart presents an alert earlier when a deviation occurs and shows a fake alert later when there is no deviation.Conclusion: The parallel tests showed that the longer the time is, the better the test’s proficiency. We concluded that the empirical Bayesian method could be applied effectively to improve the capability of daily control in CBC laboratory tests.Keywords: empirical Bayesian, EB, average run length, ARL, complete blood count, CBC, Levey–Jennings control charthttps://www.dovepress.com/adjusting-quality-control-chart-limits-for-wbc-rbc-hb-and-plt-counts-t-peer-reviewed-article-RMHPempirical bayesianebaverage run lengtharlcomplete blood countcbclevey–jennings control chart
spellingShingle Liao CM
Lin CM
Kuo CC
Chen MS
Huang CY
Lin CY
Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory
Risk Management and Healthcare Policy
empirical bayesian
eb
average run length
arl
complete blood count
cbc
levey–jennings control chart
title Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory
title_full Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory
title_fullStr Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory
title_full_unstemmed Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory
title_short Adjusting Quality Control Chart Limits for WBC, RBC, Hb, and PLT Counts to Reduce Daily Control Risks in Hospital Laboratory
title_sort adjusting quality control chart limits for wbc rbc hb and plt counts to reduce daily control risks in hospital laboratory
topic empirical bayesian
eb
average run length
arl
complete blood count
cbc
levey–jennings control chart
url https://www.dovepress.com/adjusting-quality-control-chart-limits-for-wbc-rbc-hb-and-plt-counts-t-peer-reviewed-article-RMHP
work_keys_str_mv AT liaocm adjustingqualitycontrolchartlimitsforwbcrbchbandpltcountstoreducedailycontrolrisksinhospitallaboratory
AT lincm adjustingqualitycontrolchartlimitsforwbcrbchbandpltcountstoreducedailycontrolrisksinhospitallaboratory
AT kuocc adjustingqualitycontrolchartlimitsforwbcrbchbandpltcountstoreducedailycontrolrisksinhospitallaboratory
AT chenms adjustingqualitycontrolchartlimitsforwbcrbchbandpltcountstoreducedailycontrolrisksinhospitallaboratory
AT huangcy adjustingqualitycontrolchartlimitsforwbcrbchbandpltcountstoreducedailycontrolrisksinhospitallaboratory
AT lincy adjustingqualitycontrolchartlimitsforwbcrbchbandpltcountstoreducedailycontrolrisksinhospitallaboratory