Coordinated optimization control strategy of hydropower and thermal power AGC units
With the rapid increase of penetration level of new energy power generation, the construction of auxiliary service market is facing new challenges. The stricter requirements of the power plant unit AGC are proposed by the power system. How to coordinate and control the output of hydropower and therm...
Main Authors: | Zhencheng Liang, Guangzhen Lu, Ling Li, Bin Li, Yixin Zhuo, Yude Yang, Guangming Li, Cuiyun Luo, Yangtian Ning, Li Xiong |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2023-09-01
|
Series: | Energy Reports |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2352484723005668 |
Similar Items
-
Hydropower and its development
by: Janusz Steller
Published: (2013-09-01) -
The Method of Optimization of Hydropower Plant Performance for Use in Group Active Power Controller
by: Glazyrin G.V.
Published: (2017-04-01) -
AGC regulation capability prediction and optimization of coal-fired thermal power plants
by: Fei Jin, et al.
Published: (2023-11-01) -
A comprehensive review on the development of data-driven methods for wind power prediction and AGC performance evaluation in wind–thermal bundled power systems
by: Shuai Wang, et al.
Published: (2024-05-01) -
Coordinated False Data Injection Attacks in AGC System and Its Countermeasure
by: Xi He, et al.
Published: (2020-01-01)