An economic production model for deteriorating items and time dependent demand with rework and multiple production setups
Abstract Recently, much emphasis has given to study the control and maintenance of production inventories of the deteriorating items. Rework is one of the main issues in reverse logistic and green supply chain, since it can reduce production cost and the environmental problem. Many researchers have...
Main Authors: | R. Uthayakumar, S. Tharani |
---|---|
Format: | Article |
Language: | English |
Published: |
Islamic Azad University
2017-04-01
|
Series: | Journal of Industrial Engineering International |
Subjects: | |
Online Access: | http://link.springer.com/article/10.1007/s40092-017-0202-1 |
Similar Items
-
An economic production model for time dependent demand with rework and multiple production setups
by: S.R. Singh, et al.
Published: (2014-04-01) -
EPQ model for imperfect production processes with rework and random preventive machine time for deteriorating items and trended demand
by: Shah Nita H., et al.
Published: (2015-01-01) -
Multi-item economic production quantity model for imperfect items with multiple production setups and rework under the effect of preservation technology and learning environment
by: Preeti Jawla, et al.
Published: (2016-09-01) -
Rework /
by: 359804 Fried, Jason, et al.
Published: (2010) -
Multi-Product Constrained Economic Production Quantity Models for Imperfect Quality Items with Rework
by: Hadi Mokhtari, et al.
Published: (2021-06-01)