A validation model to reduce non-contributory time based on Lean tools: Case of a construction company in Perú

AbstractThe construction industry has long been suffering from high rates of non-contributory time. Construction processes are likely to include time, which is sometimes lost for non-value-adding operations resulting in time waste. Considering the large percentage of lost time in all operations, thi...

Full description

Bibliographic Details
Main Authors: Olenka Cabrera, Joselyn Tejeda, José Llontop, Pablo Mendoza, José C. Alvarez, Sevilay Demirkesen
Format: Article
Language:English
Published: Taylor & Francis Group 2023-12-01
Series:Cogent Engineering
Subjects:
Online Access:https://www.tandfonline.com/doi/10.1080/23311916.2023.2236838
_version_ 1827344463076261888
author Olenka Cabrera
Joselyn Tejeda
José Llontop
Pablo Mendoza
José C. Alvarez
Sevilay Demirkesen
author_facet Olenka Cabrera
Joselyn Tejeda
José Llontop
Pablo Mendoza
José C. Alvarez
Sevilay Demirkesen
author_sort Olenka Cabrera
collection DOAJ
description AbstractThe construction industry has long been suffering from high rates of non-contributory time. Construction processes are likely to include time, which is sometimes lost for non-value-adding operations resulting in time waste. Considering the large percentage of lost time in all operations, this study aims to reduce the high rate of non-contributory time (NCT) in construction services. To test the management model, a Peruvian company was selected as a study case. In this respect, a management model based on mostly implemented Lean tools such as Kanban, 5S, and TPM was utilized. It is of utmost importance to emphasize that this proposal aims to reduce the NCT by up to 25%, as well as reduce the number of orders generated with delay, and eventually reduce the loss or damage of materials and equipment stoppages.
first_indexed 2024-03-07T22:47:40Z
format Article
id doaj.art-7c7d4e5028d1496cae3847b8dec2df57
institution Directory Open Access Journal
issn 2331-1916
language English
last_indexed 2024-03-07T22:47:40Z
publishDate 2023-12-01
publisher Taylor & Francis Group
record_format Article
series Cogent Engineering
spelling doaj.art-7c7d4e5028d1496cae3847b8dec2df572024-02-23T15:01:40ZengTaylor & Francis GroupCogent Engineering2331-19162023-12-0110110.1080/23311916.2023.2236838A validation model to reduce non-contributory time based on Lean tools: Case of a construction company in PerúOlenka Cabrera0Joselyn Tejeda1José Llontop2Pablo Mendoza3José C. Alvarez4Sevilay Demirkesen5Department of Industrial Engineering, Universidad Peruana de Ciencias Aplicadas, Lima, PeruDepartment of Industrial Engineering, Universidad Peruana de Ciencias Aplicadas, Lima, PeruDepartment of Industrial Engineering, Universidad Peruana de Ciencias Aplicadas, Lima, PeruDepartment of Industrial Engineering, Universidad Peruana de Ciencias Aplicadas, Lima, PeruDepartment of Industrial Engineering, Universidad Peruana de Ciencias Aplicadas, Lima, PeruDepartment of Civil Engineering, Gebze Technical University, Kocaeli, TurkeyAbstractThe construction industry has long been suffering from high rates of non-contributory time. Construction processes are likely to include time, which is sometimes lost for non-value-adding operations resulting in time waste. Considering the large percentage of lost time in all operations, this study aims to reduce the high rate of non-contributory time (NCT) in construction services. To test the management model, a Peruvian company was selected as a study case. In this respect, a management model based on mostly implemented Lean tools such as Kanban, 5S, and TPM was utilized. It is of utmost importance to emphasize that this proposal aims to reduce the NCT by up to 25%, as well as reduce the number of orders generated with delay, and eventually reduce the loss or damage of materials and equipment stoppages.https://www.tandfonline.com/doi/10.1080/23311916.2023.2236838construction industryKanbanlean toolsnon-contributory time5STPM
spellingShingle Olenka Cabrera
Joselyn Tejeda
José Llontop
Pablo Mendoza
José C. Alvarez
Sevilay Demirkesen
A validation model to reduce non-contributory time based on Lean tools: Case of a construction company in Perú
Cogent Engineering
construction industry
Kanban
lean tools
non-contributory time
5S
TPM
title A validation model to reduce non-contributory time based on Lean tools: Case of a construction company in Perú
title_full A validation model to reduce non-contributory time based on Lean tools: Case of a construction company in Perú
title_fullStr A validation model to reduce non-contributory time based on Lean tools: Case of a construction company in Perú
title_full_unstemmed A validation model to reduce non-contributory time based on Lean tools: Case of a construction company in Perú
title_short A validation model to reduce non-contributory time based on Lean tools: Case of a construction company in Perú
title_sort validation model to reduce non contributory time based on lean tools case of a construction company in peru
topic construction industry
Kanban
lean tools
non-contributory time
5S
TPM
url https://www.tandfonline.com/doi/10.1080/23311916.2023.2236838
work_keys_str_mv AT olenkacabrera avalidationmodeltoreducenoncontributorytimebasedonleantoolscaseofaconstructioncompanyinperu
AT joselyntejeda avalidationmodeltoreducenoncontributorytimebasedonleantoolscaseofaconstructioncompanyinperu
AT josellontop avalidationmodeltoreducenoncontributorytimebasedonleantoolscaseofaconstructioncompanyinperu
AT pablomendoza avalidationmodeltoreducenoncontributorytimebasedonleantoolscaseofaconstructioncompanyinperu
AT josecalvarez avalidationmodeltoreducenoncontributorytimebasedonleantoolscaseofaconstructioncompanyinperu
AT sevilaydemirkesen avalidationmodeltoreducenoncontributorytimebasedonleantoolscaseofaconstructioncompanyinperu
AT olenkacabrera validationmodeltoreducenoncontributorytimebasedonleantoolscaseofaconstructioncompanyinperu
AT joselyntejeda validationmodeltoreducenoncontributorytimebasedonleantoolscaseofaconstructioncompanyinperu
AT josellontop validationmodeltoreducenoncontributorytimebasedonleantoolscaseofaconstructioncompanyinperu
AT pablomendoza validationmodeltoreducenoncontributorytimebasedonleantoolscaseofaconstructioncompanyinperu
AT josecalvarez validationmodeltoreducenoncontributorytimebasedonleantoolscaseofaconstructioncompanyinperu
AT sevilaydemirkesen validationmodeltoreducenoncontributorytimebasedonleantoolscaseofaconstructioncompanyinperu