A validation model to reduce non-contributory time based on Lean tools: Case of a construction company in Perú

AbstractThe construction industry has long been suffering from high rates of non-contributory time. Construction processes are likely to include time, which is sometimes lost for non-value-adding operations resulting in time waste. Considering the large percentage of lost time in all operations, thi...

全面介紹

書目詳細資料
Main Authors: Olenka Cabrera, Joselyn Tejeda, José Llontop, Pablo Mendoza, José C. Alvarez, Sevilay Demirkesen
格式: Article
語言:English
出版: Taylor & Francis Group 2023-12-01
叢編:Cogent Engineering
主題:
在線閱讀:https://www.tandfonline.com/doi/10.1080/23311916.2023.2236838