A validation model to reduce non-contributory time based on Lean tools: Case of a construction company in Perú
AbstractThe construction industry has long been suffering from high rates of non-contributory time. Construction processes are likely to include time, which is sometimes lost for non-value-adding operations resulting in time waste. Considering the large percentage of lost time in all operations, thi...
Main Authors: | Olenka Cabrera, Joselyn Tejeda, José Llontop, Pablo Mendoza, José C. Alvarez, Sevilay Demirkesen |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2023-12-01
|
Series: | Cogent Engineering |
Subjects: | |
Online Access: | https://www.tandfonline.com/doi/10.1080/23311916.2023.2236838 |
Similar Items
-
LEAN PRODUCTION, LEAN VS. MASS PRODUCTION, TPM AS A TOOL OF LEAN PRODUCTION
by: Mária Mičietová
Published: (2011-12-01) -
Territories of Contributory Learning
by: Mauro Magatti
Published: (2022-03-01) -
Territories of Contributory Learning
by: Mauro Magatti
Published: (2022-09-01) -
Facing Challenges of Implementing Total Productive Management and Lean Tools in Manufacturing Enterprises
by: Tomislav Slavina, et al.
Published: (2024-02-01) -
INTERROGATING THE IMPLEMENTATION OF THE CONTRIBUTORY PENSION SCHEME IN NIGERIA
by: Cletus Adeyemoh Olunde
Published: (2023-06-01)