Performance management at Ukrainian university: A case of the KPIs use

Implementing performance management systems, including the KPI (Key Performance Indicators) system, at the university level faces many difficulties. The study aims to determine the problems of formation and implementation of the system of KPIs at the HEIs (higher education institutions) level based...

Full description

Bibliographic Details
Main Authors: Larysa Shaulska, Oleksandra Laktionova, Tetyana Nagornyak, Hanna Sereda
Format: Article
Language:English
Published: LLC "CPC "Business Perspectives" 2021-02-01
Series:Problems and Perspectives in Management
Subjects:
Online Access:https://businessperspectives.org/images/pdf/applications/publishing/templates/article/assets/14628/PPM_2021_01_Shaulska.pdf
_version_ 1818934471487913984
author Larysa Shaulska
Oleksandra Laktionova
Tetyana Nagornyak
Hanna Sereda
author_facet Larysa Shaulska
Oleksandra Laktionova
Tetyana Nagornyak
Hanna Sereda
author_sort Larysa Shaulska
collection DOAJ
description Implementing performance management systems, including the KPI (Key Performance Indicators) system, at the university level faces many difficulties. The study aims to determine the problems of formation and implementation of the system of KPIs at the HEIs (higher education institutions) level based on the case study. Methodologically the study is based on the analysis of the case of the KPI system implementation at Vasyl’ Stus Donetsk National University (Ukraine) using a 3-year project survey of managers and employees of structural units about self-analysis of deviations and perception of each performance indicator. The essential subjective factor – irrational participants’ behavior – is demonstrated, reflected in their resistance, fear, and lack of acceptance of innovations in assessment processes, which needs to delineate tools for effective KPI system implementation (reduction of its negative influence and growth of the personnel loyalty). The main organizational obstacles that reduce such a measurement system’s efficiency are incomprehensibility, difficulty of evaluation, non-influence or independency of indicators from the efforts of respondents, poor communication, and motivation to achieve them. The analysis results allowed providing the recommendations that could contribute to the formation of reflexive and active management culture in the strategic management system and a culture of productive dialogue through vertically and horizontally management interaction.
first_indexed 2024-12-20T05:04:48Z
format Article
id doaj.art-7c8094a615c54fdaaa82bf28205fc077
institution Directory Open Access Journal
issn 1727-7051
1810-5467
language English
last_indexed 2024-12-20T05:04:48Z
publishDate 2021-02-01
publisher LLC "CPC "Business Perspectives"
record_format Article
series Problems and Perspectives in Management
spelling doaj.art-7c8094a615c54fdaaa82bf28205fc0772022-12-21T19:52:26ZengLLC "CPC "Business Perspectives"Problems and Perspectives in Management1727-70511810-54672021-02-01191788910.21511/ppm.19(1).2021.0714628Performance management at Ukrainian university: A case of the KPIs useLarysa Shaulska0https://orcid.org/0000-0002-7919-6733Oleksandra Laktionova1https://orcid.org/0000-0001-6472-6503Tetyana Nagornyak2https://orcid.org/0000-0002-6416-5774Hanna Sereda3https://orcid.org/0000-0001-9222-1887Doctor of Economics, Professor, Taras Shevchenko National University of Kyiv Doctor of Economics, Associate Professor, Vasyl’ Stus Donetsk National UniversityDoctor of Political Science, Professor, Vasyl’ Stus Donetsk National UniversityPh.D., Associate Professor, Vasyl’ Stus Donetsk National UniversityImplementing performance management systems, including the KPI (Key Performance Indicators) system, at the university level faces many difficulties. The study aims to determine the problems of formation and implementation of the system of KPIs at the HEIs (higher education institutions) level based on the case study. Methodologically the study is based on the analysis of the case of the KPI system implementation at Vasyl’ Stus Donetsk National University (Ukraine) using a 3-year project survey of managers and employees of structural units about self-analysis of deviations and perception of each performance indicator. The essential subjective factor – irrational participants’ behavior – is demonstrated, reflected in their resistance, fear, and lack of acceptance of innovations in assessment processes, which needs to delineate tools for effective KPI system implementation (reduction of its negative influence and growth of the personnel loyalty). The main organizational obstacles that reduce such a measurement system’s efficiency are incomprehensibility, difficulty of evaluation, non-influence or independency of indicators from the efforts of respondents, poor communication, and motivation to achieve them. The analysis results allowed providing the recommendations that could contribute to the formation of reflexive and active management culture in the strategic management system and a culture of productive dialogue through vertically and horizontally management interaction.https://businessperspectives.org/images/pdf/applications/publishing/templates/article/assets/14628/PPM_2021_01_Shaulska.pdfindicatorsinnovation resistancemeasurementpublic managementstrategic planning
spellingShingle Larysa Shaulska
Oleksandra Laktionova
Tetyana Nagornyak
Hanna Sereda
Performance management at Ukrainian university: A case of the KPIs use
Problems and Perspectives in Management
indicators
innovation resistance
measurement
public management
strategic planning
title Performance management at Ukrainian university: A case of the KPIs use
title_full Performance management at Ukrainian university: A case of the KPIs use
title_fullStr Performance management at Ukrainian university: A case of the KPIs use
title_full_unstemmed Performance management at Ukrainian university: A case of the KPIs use
title_short Performance management at Ukrainian university: A case of the KPIs use
title_sort performance management at ukrainian university a case of the kpis use
topic indicators
innovation resistance
measurement
public management
strategic planning
url https://businessperspectives.org/images/pdf/applications/publishing/templates/article/assets/14628/PPM_2021_01_Shaulska.pdf
work_keys_str_mv AT larysashaulska performancemanagementatukrainianuniversityacaseofthekpisuse
AT oleksandralaktionova performancemanagementatukrainianuniversityacaseofthekpisuse
AT tetyananagornyak performancemanagementatukrainianuniversityacaseofthekpisuse
AT hannasereda performancemanagementatukrainianuniversityacaseofthekpisuse