Technical rationing of the construction technology of reinforced concrete floor slabs using non-removable void formers

Technically sound standards of time and production standards are designed to improve production efficiency, technical and economic indicators of construction enterprises, timely commissioning of buildings and structures being erected, as well as ensuring the proper organization of workers' wage...

Full description

Bibliographic Details
Main Authors: Dmitry V. Topchiy, Alina S. Bolotova, Aleksey S. Vorobev, Alevtina V. Atamanenko
Format: Article
Language:English
Published: Peoples’ Friendship University of Russia (RUDN University) 2019-12-01
Series:RUDN Journal of Engineering Research
Subjects:
Online Access:http://journals.rudn.ru/engineering-researches/article/viewFile/22674/17691
_version_ 1797709141089714176
author Dmitry V. Topchiy
Alina S. Bolotova
Aleksey S. Vorobev
Alevtina V. Atamanenko
author_facet Dmitry V. Topchiy
Alina S. Bolotova
Aleksey S. Vorobev
Alevtina V. Atamanenko
author_sort Dmitry V. Topchiy
collection DOAJ
description Technically sound standards of time and production standards are designed to improve production efficiency, technical and economic indicators of construction enterprises, timely commissioning of buildings and structures being erected, as well as ensuring the proper organization of workers' wages. Labor standards are used in determining the need for construction machinery and equipment, the required number of workers, and also serve as the basis for the development of network and calendar schedules that are part of the project of construction organization (PCO) and the project of construction production (PCP). Standards of time and standards for the production of most of the construction work are contained in the collections of common norms and rates and state elemental estimated norms. However, in the conditions of continuous development and introduction of new production technologies, there is a need to update and refine the existing technical regulation database. Standards of time, corresponding to the modern level of technical development and reflecting the advanced experience of workers, allow to make the right choice when analyzing the most economical ways of producing work. Definition and removal of production standards is to determine the weighted average number of working hours to perform a particular technological operation, while taking into account the conditions of production of this workflow, the numerical and qualification composition of workers.
first_indexed 2024-03-12T06:33:03Z
format Article
id doaj.art-7d4c12e18d8640868cf3147e89073904
institution Directory Open Access Journal
issn 2312-8143
2312-8151
language English
last_indexed 2024-03-12T06:33:03Z
publishDate 2019-12-01
publisher Peoples’ Friendship University of Russia (RUDN University)
record_format Article
series RUDN Journal of Engineering Research
spelling doaj.art-7d4c12e18d8640868cf3147e890739042023-09-03T01:30:44ZengPeoples’ Friendship University of Russia (RUDN University)RUDN Journal of Engineering Research2312-81432312-81512019-12-0120215516210.22363/2312-8143-2019-20-2-155-16218390Technical rationing of the construction technology of reinforced concrete floor slabs using non-removable void formersDmitry V. Topchiy0Alina S. Bolotova1Aleksey S. Vorobev2Alevtina V. Atamanenko3Moscow State University of Civil Engineering (National Research University)Moscow State University of Civil Engineering (National Research University)Moscow State University of Civil Engineering (National Research University)Moscow State University of Civil Engineering (National Research University)Technically sound standards of time and production standards are designed to improve production efficiency, technical and economic indicators of construction enterprises, timely commissioning of buildings and structures being erected, as well as ensuring the proper organization of workers' wages. Labor standards are used in determining the need for construction machinery and equipment, the required number of workers, and also serve as the basis for the development of network and calendar schedules that are part of the project of construction organization (PCO) and the project of construction production (PCP). Standards of time and standards for the production of most of the construction work are contained in the collections of common norms and rates and state elemental estimated norms. However, in the conditions of continuous development and introduction of new production technologies, there is a need to update and refine the existing technical regulation database. Standards of time, corresponding to the modern level of technical development and reflecting the advanced experience of workers, allow to make the right choice when analyzing the most economical ways of producing work. Definition and removal of production standards is to determine the weighted average number of working hours to perform a particular technological operation, while taking into account the conditions of production of this workflow, the numerical and qualification composition of workers.http://journals.rudn.ru/engineering-researches/article/viewFile/22674/17691technical rationingnon-removable voidforming linersholderstime rateproduction norms
spellingShingle Dmitry V. Topchiy
Alina S. Bolotova
Aleksey S. Vorobev
Alevtina V. Atamanenko
Technical rationing of the construction technology of reinforced concrete floor slabs using non-removable void formers
RUDN Journal of Engineering Research
technical rationing
non-removable voidforming liners
holders
time rate
production norms
title Technical rationing of the construction technology of reinforced concrete floor slabs using non-removable void formers
title_full Technical rationing of the construction technology of reinforced concrete floor slabs using non-removable void formers
title_fullStr Technical rationing of the construction technology of reinforced concrete floor slabs using non-removable void formers
title_full_unstemmed Technical rationing of the construction technology of reinforced concrete floor slabs using non-removable void formers
title_short Technical rationing of the construction technology of reinforced concrete floor slabs using non-removable void formers
title_sort technical rationing of the construction technology of reinforced concrete floor slabs using non removable void formers
topic technical rationing
non-removable voidforming liners
holders
time rate
production norms
url http://journals.rudn.ru/engineering-researches/article/viewFile/22674/17691
work_keys_str_mv AT dmitryvtopchiy technicalrationingoftheconstructiontechnologyofreinforcedconcretefloorslabsusingnonremovablevoidformers
AT alinasbolotova technicalrationingoftheconstructiontechnologyofreinforcedconcretefloorslabsusingnonremovablevoidformers
AT alekseysvorobev technicalrationingoftheconstructiontechnologyofreinforcedconcretefloorslabsusingnonremovablevoidformers
AT alevtinavatamanenko technicalrationingoftheconstructiontechnologyofreinforcedconcretefloorslabsusingnonremovablevoidformers