Dimensionality Reduction Method of Dynamic Programming under Hourly Scale and Its Application in Optimal Scheduling of Reservoir Flood Control
In flood control scheduling of reservoirs, the usual conventional scheduling fails to obtain the optimal solution to the problem. The dynamic programming method is applied to the field. However, the problem of ‘dimensional disaster’ restricts its application. To solve these problems, the improved DP...
Main Authors: | Suiling Wang, Zhiqiang Jiang, Yi Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-01-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/15/3/676 |
Similar Items
-
Optimized Flood Control Scheduling of Goupitan Reservoir Based on Dynamic Programming and Grey Wolf Algorithm
by: FENG Huan, et al.
Published: (2024-11-01) -
Joint flood control scheduling strategy of large cascade reservoirs: A case study of the cascade reservoirs in the upper reaches of the Yangtze River in China
by: Zhu Jing, et al.
Published: (2022-09-01) -
Floods and reservoir safety /
by: Institution of Civil Engineers (Great Britain)
Published: (1996) -
Reservoir flood estimation : another look /
by: 248321 Reed, Duncan W., et al.
Published: (1992) -
Floods and reservoir safety
by: Institution of Civil Engineers (Great Britain)
Published: (2015)