Example of development of production schedule in the reorganization of residential areas
Reducing production in case of significant problems with production capacity is not a popular solution for many managers, but the benefits of such a solution may be unexpected. Firstly, the economic performance of production can be really improved because the reduction of work intensity eliminates c...
Main Authors: | Dzhusoev German, Sinenko Sergey, Slavin Alexey |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201819305050 |
Similar Items
-
Ensuring the rational temperature conditions for concrete hardening
by: Dzhusoev German, et al.
Published: (2019-01-01) -
Processing of exterior light concrete wall panels
by: Zhadanovsky Boris, et al.
Published: (2018-01-01) -
Reduction of terms of demolition works of fully assembled residential buildings in Moscow
by: Slavina Anastasiia, et al.
Published: (2019-01-01) -
REORGANIZATION OF THE TECHNOLOGICAL FLOW AT CLOTHING COMPANY THROUGH THE PRODUCTION SCHEDULE
by: GHELBET Angela, et al.
Published: (2017-05-01) -
Analyzing the functional capabilities of modern systems, methods and means for scheduling
by: Sinenko Sergey
Published: (2017-01-01)