A Hybrid Estimation of Distribution Algorithm for the Quay Crane Scheduling Problem
The aim of the quay crane scheduling problem (QCSP) is to identify the best sequence of discharging and loading operations for a set of quay cranes. This problem is solved with a new hybrid estimation of distribution algorithm (EDA). The approach is proposed to tackle the drawbacks of the EDAs, i.e....
Main Author: | Ricardo Pérez-Rodríguez |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-09-01
|
Series: | Mathematical and Computational Applications |
Subjects: | |
Online Access: | https://www.mdpi.com/2297-8747/26/3/64 |
Similar Items
-
Enhanced Multi-Objective Evolutionary Algorithm for Green Scheduling of Heterogeneous Quay Cranes Considering Cooperative Movement and Safety
by: Lingchong Zhong, et al.
Published: (2023-09-01) -
Bi-Objective Integrated Scheduling of Quay Cranes and Automated Guided Vehicles
by: Yating Duan, et al.
Published: (2023-07-01) -
A Branch-and-Bound Algorithm for the Bi-Objective Quay Crane Scheduling Problem Based on Efficiency and Energy
by: Hongming Li, et al.
Published: (2022-12-01) -
A bounded two-level dynamic programming algorithm for quay crane scheduling in container terminals
by: Huang, Shell Ying, et al.
Published: (2018) -
An Efficient Algorithm for the Berth and Quay Crane Assignments Considering Operator Performance in Container Terminal Using Particle Swarm Model
by: Nyamatari Anselem Tengecha, et al.
Published: (2022-09-01)