Long-Term Thermal Stress Analysis and Optimization of Contraction Joint Distance of Concrete Gravity Dams

Results of the conducted research aiming to demonstrate the methodology of optimization of dam monolith length (distance between contraction joints), through monitoring the thermal tensile stresses during construction and service life of a concrete gravity dam that is built using the block method, a...

Full description

Bibliographic Details
Main Authors: Uroš Mirković, Vladan Kuzmanović, Goran Todorović
Format: Article
Language:English
Published: MDPI AG 2022-08-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/12/16/8163
_version_ 1797411365386715136
author Uroš Mirković
Vladan Kuzmanović
Goran Todorović
author_facet Uroš Mirković
Vladan Kuzmanović
Goran Todorović
author_sort Uroš Mirković
collection DOAJ
description Results of the conducted research aiming to demonstrate the methodology of optimization of dam monolith length (distance between contraction joints), through monitoring the thermal tensile stresses during construction and service life of a concrete gravity dam that is built using the block method, are presented in this paper. A 3D space–time numerical model for phased thermal stress analysis is employed in a large concrete gravity dam case study. For the adopted block dimensions, schedule, and dynamics of construction and material parameters, the thermal stress analysis is conducted, taking into account the following: thermal physical properties of the material, the cement hydration process, heat exchange with the external environment and the reservoir, and self-weight of the structure. The main advantage of the proposed methodology is the possibility of controlling the cracks resulting from thermal tensile stresses in the monolith of a concrete gravity dam, by optimizing the monolith’s length to minimize the zones in which the tensile capacity of concrete is exceeded. The results obtained from the temperature field analysis show that the maximum temperature increase in the dam’s body results from the cement hydration process in combination with summer air temperatures in the construction phase. The aforementioned factors account for the increase in temperature of up to 45.0 °C, while during winter cooling of the structure occurs due to lower temperatures, especially in the surface zones. The results of the stress field analysis show that the extreme values of thermal tensile stresses are present in the process of a sudden or gradual cooling of the concrete when shrinkage occurs. Finally, it is shown that the reduction of the monolith length by 5.0 m (from 20.0 m to 15.0 m) results in a decrease in the extreme thermal tensile stress values by an average of 0.70 MPa (up to 12.0%) in winter and an average of 1.10 MPa (up to 20.0%) in summer; while for the entirety of the analyzed time period, results in a decrease in the extreme thermal tensile stress values by an average of 16.0% (0.93 MPa).
first_indexed 2024-03-09T04:44:04Z
format Article
id doaj.art-7ed9d000482b4cd2b03669b9da53cf69
institution Directory Open Access Journal
issn 2076-3417
language English
last_indexed 2024-03-09T04:44:04Z
publishDate 2022-08-01
publisher MDPI AG
record_format Article
series Applied Sciences
spelling doaj.art-7ed9d000482b4cd2b03669b9da53cf692023-12-03T13:17:36ZengMDPI AGApplied Sciences2076-34172022-08-011216816310.3390/app12168163Long-Term Thermal Stress Analysis and Optimization of Contraction Joint Distance of Concrete Gravity DamsUroš Mirković0Vladan Kuzmanović1Goran Todorović2Jaroslav Černi Water Institute, 11226 Belgrade, SerbiaFaculty of Civil Engineering, University of Belgrade, 11120 Belgrade, SerbiaFaculty of Civil Engineering, University of Belgrade, 11120 Belgrade, SerbiaResults of the conducted research aiming to demonstrate the methodology of optimization of dam monolith length (distance between contraction joints), through monitoring the thermal tensile stresses during construction and service life of a concrete gravity dam that is built using the block method, are presented in this paper. A 3D space–time numerical model for phased thermal stress analysis is employed in a large concrete gravity dam case study. For the adopted block dimensions, schedule, and dynamics of construction and material parameters, the thermal stress analysis is conducted, taking into account the following: thermal physical properties of the material, the cement hydration process, heat exchange with the external environment and the reservoir, and self-weight of the structure. The main advantage of the proposed methodology is the possibility of controlling the cracks resulting from thermal tensile stresses in the monolith of a concrete gravity dam, by optimizing the monolith’s length to minimize the zones in which the tensile capacity of concrete is exceeded. The results obtained from the temperature field analysis show that the maximum temperature increase in the dam’s body results from the cement hydration process in combination with summer air temperatures in the construction phase. The aforementioned factors account for the increase in temperature of up to 45.0 °C, while during winter cooling of the structure occurs due to lower temperatures, especially in the surface zones. The results of the stress field analysis show that the extreme values of thermal tensile stresses are present in the process of a sudden or gradual cooling of the concrete when shrinkage occurs. Finally, it is shown that the reduction of the monolith length by 5.0 m (from 20.0 m to 15.0 m) results in a decrease in the extreme thermal tensile stress values by an average of 0.70 MPa (up to 12.0%) in winter and an average of 1.10 MPa (up to 20.0%) in summer; while for the entirety of the analyzed time period, results in a decrease in the extreme thermal tensile stress values by an average of 16.0% (0.93 MPa).https://www.mdpi.com/2076-3417/12/16/8163phased thermal stress analysisconcrete gravity damtemperature fieldthermal tensile stressesmonolith lengthcrack control
spellingShingle Uroš Mirković
Vladan Kuzmanović
Goran Todorović
Long-Term Thermal Stress Analysis and Optimization of Contraction Joint Distance of Concrete Gravity Dams
Applied Sciences
phased thermal stress analysis
concrete gravity dam
temperature field
thermal tensile stresses
monolith length
crack control
title Long-Term Thermal Stress Analysis and Optimization of Contraction Joint Distance of Concrete Gravity Dams
title_full Long-Term Thermal Stress Analysis and Optimization of Contraction Joint Distance of Concrete Gravity Dams
title_fullStr Long-Term Thermal Stress Analysis and Optimization of Contraction Joint Distance of Concrete Gravity Dams
title_full_unstemmed Long-Term Thermal Stress Analysis and Optimization of Contraction Joint Distance of Concrete Gravity Dams
title_short Long-Term Thermal Stress Analysis and Optimization of Contraction Joint Distance of Concrete Gravity Dams
title_sort long term thermal stress analysis and optimization of contraction joint distance of concrete gravity dams
topic phased thermal stress analysis
concrete gravity dam
temperature field
thermal tensile stresses
monolith length
crack control
url https://www.mdpi.com/2076-3417/12/16/8163
work_keys_str_mv AT urosmirkovic longtermthermalstressanalysisandoptimizationofcontractionjointdistanceofconcretegravitydams
AT vladankuzmanovic longtermthermalstressanalysisandoptimizationofcontractionjointdistanceofconcretegravitydams
AT gorantodorovic longtermthermalstressanalysisandoptimizationofcontractionjointdistanceofconcretegravitydams