Cost approach to the flow-shop construction scheduling
A flow-shop construction scheduling – especially for a higher number of tasks projected – requires the use of metaheuristic algorithms to find the optimal schedule. The criteria of optimality may vary as well as constraints assumed for the schedule. The paper presents base rules of the flow-shop sch...
Main Authors: | Anysz Hubert, Krzemiński Michał |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/36/e3sconf_spbwosce2019_02048.pdf |
Similar Items
-
Optimization of Work Schedules Executed using the Flow Shop Model, Assuming Multitasking Performed by Work Crews
by: Krzemiński M.
Published: (2017-12-01) -
The cost minimizing solution of the transportation problem for the location of the building machinery yard along the road under construction
by: Hubert Anysz
Published: (2018-04-01) -
KASS v.2.2. scheduling software for construction
by: Krzemiński Michał
Published: (2016-01-01) -
Construction Scheduling and Stability of the Resulting Schedules
by: Krzemiński M.
Published: (2016-06-01) -
Cost minimization of locating construction machinery park with the use of simulation and optimization algorithms
by: Anysz Hubert, et al.
Published: (2018-01-01)