Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE)

The packing plant department 1 is still lacking in meeting production productivity targets. Therefore, the availability of raw materials and the condition of machinery and equipment is important to consider so that product productivity can be optimized. Three aspects affect the effectiveness of the...

Full description

Bibliographic Details
Main Authors: Melani Magdalena Hutabarat, Ahmad Muhsin
Format: Article
Language:Indonesian
Published: Universitas Pembangunan Nasional "Veteran" Yogyakarta 2020-06-01
Series:OPSI
Subjects:
Online Access:http://jurnal.upnyk.ac.id/index.php/opsi/article/view/3468
_version_ 1818648380268609536
author Melani Magdalena Hutabarat
Ahmad Muhsin
author_facet Melani Magdalena Hutabarat
Ahmad Muhsin
author_sort Melani Magdalena Hutabarat
collection DOAJ
description The packing plant department 1 is still lacking in meeting production productivity targets. Therefore, the availability of raw materials and the condition of machinery and equipment is important to consider so that product productivity can be optimized. Three aspects affect the effectiveness of the machine in the packing department, namely productive time, work speed of the machine, and the quality of the product produced. The purpose of this study is to measure the effectiveness of the auto hanger engine by using the Overall Equipment Effectiveness (OEE) method to obtain the value of availability, performance efficiency, and rate of quality. The results obtained from OEE calculations are expected to be an evaluation of improvements in effectiveness that will be generated in the future. Based on the results of research that overall equipment effectiveness on the three machines has not reached world-class standards, which is> 85%. The availability value on the three machines also still does not meet the world-class standard, which is> 90%. The performance of rate values on the three machines also still does not meet world-class standards, which is> 95%. The availability value on the three machines also still does not meet the world-class standard, which is> 99%.
first_indexed 2024-12-17T01:17:30Z
format Article
id doaj.art-7fd0c99b805c4e988f94c3cd204a4cb9
institution Directory Open Access Journal
issn 1693-2102
2686-2352
language Indonesian
last_indexed 2024-12-17T01:17:30Z
publishDate 2020-06-01
publisher Universitas Pembangunan Nasional "Veteran" Yogyakarta
record_format Article
series OPSI
spelling doaj.art-7fd0c99b805c4e988f94c3cd204a4cb92022-12-21T22:08:57ZindUniversitas Pembangunan Nasional "Veteran" YogyakartaOPSI1693-21022686-23522020-06-01131566110.31315/opsi.v13i1.34682530Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE)Melani Magdalena Hutabarat0Ahmad Muhsin1Universitas Pembangunan Nasional Veteran YogyakartaUniversitas Pembangunan Nasional Veteran YogyakartaThe packing plant department 1 is still lacking in meeting production productivity targets. Therefore, the availability of raw materials and the condition of machinery and equipment is important to consider so that product productivity can be optimized. Three aspects affect the effectiveness of the machine in the packing department, namely productive time, work speed of the machine, and the quality of the product produced. The purpose of this study is to measure the effectiveness of the auto hanger engine by using the Overall Equipment Effectiveness (OEE) method to obtain the value of availability, performance efficiency, and rate of quality. The results obtained from OEE calculations are expected to be an evaluation of improvements in effectiveness that will be generated in the future. Based on the results of research that overall equipment effectiveness on the three machines has not reached world-class standards, which is> 85%. The availability value on the three machines also still does not meet the world-class standard, which is> 90%. The performance of rate values on the three machines also still does not meet world-class standards, which is> 95%. The availability value on the three machines also still does not meet the world-class standard, which is> 99%.http://jurnal.upnyk.ac.id/index.php/opsi/article/view/3468oeemachinerydepartment of plant
spellingShingle Melani Magdalena Hutabarat
Ahmad Muhsin
Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE)
OPSI
oee
machinery
department of plant
title Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE)
title_full Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE)
title_fullStr Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE)
title_full_unstemmed Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE)
title_short Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE)
title_sort analisis tingkat efektivitas kerja pada mesin auto hanger dengan menggunakan metode overall equipment effectiveness oee
topic oee
machinery
department of plant
url http://jurnal.upnyk.ac.id/index.php/opsi/article/view/3468
work_keys_str_mv AT melanimagdalenahutabarat analisistingkatefektivitaskerjapadamesinautohangerdenganmenggunakanmetodeoverallequipmenteffectivenessoee
AT ahmadmuhsin analisistingkatefektivitaskerjapadamesinautohangerdenganmenggunakanmetodeoverallequipmenteffectivenessoee