Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE)
The packing plant department 1 is still lacking in meeting production productivity targets. Therefore, the availability of raw materials and the condition of machinery and equipment is important to consider so that product productivity can be optimized. Three aspects affect the effectiveness of the...
Main Authors: | , |
---|---|
Format: | Article |
Language: | Indonesian |
Published: |
Universitas Pembangunan Nasional "Veteran" Yogyakarta
2020-06-01
|
Series: | OPSI |
Subjects: | |
Online Access: | http://jurnal.upnyk.ac.id/index.php/opsi/article/view/3468 |
_version_ | 1818648380268609536 |
---|---|
author | Melani Magdalena Hutabarat Ahmad Muhsin |
author_facet | Melani Magdalena Hutabarat Ahmad Muhsin |
author_sort | Melani Magdalena Hutabarat |
collection | DOAJ |
description | The packing plant department 1 is still lacking in meeting production productivity targets. Therefore, the availability of raw materials and the condition of machinery and equipment is important to consider so that product productivity can be optimized. Three aspects affect the effectiveness of the machine in the packing department, namely productive time, work speed of the machine, and the quality of the product produced. The purpose of this study is to measure the effectiveness of the auto hanger engine by using the Overall Equipment Effectiveness (OEE) method to obtain the value of availability, performance efficiency, and rate of quality. The results obtained from OEE calculations are expected to be an evaluation of improvements in effectiveness that will be generated in the future. Based on the results of research that overall equipment effectiveness on the three machines has not reached world-class standards, which is> 85%. The availability value on the three machines also still does not meet the world-class standard, which is> 90%. The performance of rate values on the three machines also still does not meet world-class standards, which is> 95%. The availability value on the three machines also still does not meet the world-class standard, which is> 99%. |
first_indexed | 2024-12-17T01:17:30Z |
format | Article |
id | doaj.art-7fd0c99b805c4e988f94c3cd204a4cb9 |
institution | Directory Open Access Journal |
issn | 1693-2102 2686-2352 |
language | Indonesian |
last_indexed | 2024-12-17T01:17:30Z |
publishDate | 2020-06-01 |
publisher | Universitas Pembangunan Nasional "Veteran" Yogyakarta |
record_format | Article |
series | OPSI |
spelling | doaj.art-7fd0c99b805c4e988f94c3cd204a4cb92022-12-21T22:08:57ZindUniversitas Pembangunan Nasional "Veteran" YogyakartaOPSI1693-21022686-23522020-06-01131566110.31315/opsi.v13i1.34682530Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE)Melani Magdalena Hutabarat0Ahmad Muhsin1Universitas Pembangunan Nasional Veteran YogyakartaUniversitas Pembangunan Nasional Veteran YogyakartaThe packing plant department 1 is still lacking in meeting production productivity targets. Therefore, the availability of raw materials and the condition of machinery and equipment is important to consider so that product productivity can be optimized. Three aspects affect the effectiveness of the machine in the packing department, namely productive time, work speed of the machine, and the quality of the product produced. The purpose of this study is to measure the effectiveness of the auto hanger engine by using the Overall Equipment Effectiveness (OEE) method to obtain the value of availability, performance efficiency, and rate of quality. The results obtained from OEE calculations are expected to be an evaluation of improvements in effectiveness that will be generated in the future. Based on the results of research that overall equipment effectiveness on the three machines has not reached world-class standards, which is> 85%. The availability value on the three machines also still does not meet the world-class standard, which is> 90%. The performance of rate values on the three machines also still does not meet world-class standards, which is> 95%. The availability value on the three machines also still does not meet the world-class standard, which is> 99%.http://jurnal.upnyk.ac.id/index.php/opsi/article/view/3468oeemachinerydepartment of plant |
spellingShingle | Melani Magdalena Hutabarat Ahmad Muhsin Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) OPSI oee machinery department of plant |
title | Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) |
title_full | Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) |
title_fullStr | Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) |
title_full_unstemmed | Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) |
title_short | Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) |
title_sort | analisis tingkat efektivitas kerja pada mesin auto hanger dengan menggunakan metode overall equipment effectiveness oee |
topic | oee machinery department of plant |
url | http://jurnal.upnyk.ac.id/index.php/opsi/article/view/3468 |
work_keys_str_mv | AT melanimagdalenahutabarat analisistingkatefektivitaskerjapadamesinautohangerdenganmenggunakanmetodeoverallequipmenteffectivenessoee AT ahmadmuhsin analisistingkatefektivitaskerjapadamesinautohangerdenganmenggunakanmetodeoverallequipmenteffectivenessoee |