Polymer Concrete for Bridge Deck Closure Joints in Accelerated Bridge Construction
Prefabricated concrete bridge deck panels are utilized in Accelerated Bridge Construction (ABC) to simplify bridge deck construction. Concrete with good bond and shear strength as well as excellent flowability is required to fill bridge deck closure joints. This paper discusses the use of polymer co...
Main Authors: | Islam Mantawy, Rahulreddy Chennareddy, Moneeb Genedy, Mahmoud Reda Taha |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-06-01
|
Series: | Infrastructures |
Subjects: | |
Online Access: | https://www.mdpi.com/2412-3811/4/2/31 |
Similar Items
-
Deck Slab Elements for the Accelerated Construction of Steel–Concrete Composite Bridges
by: Franz Untermarzoner, et al.
Published: (2023-07-01) -
Experimental Behavior of Precast Bridge Deck Systems with Non-Proprietary UHPC Transverse Field Joints
by: Mohamed Abokifa, et al.
Published: (2021-11-01) -
Airfoil and bridge deck flutter derivatives/
by: 218009 Scanlan, Robert H., et al. -
Hydraulic profiles of flood flow inundating bridge deck /
by: Nor Suhada Abd. Rashid, 1987-, author, et al.
Published: (2011) -
Evaluation the Impact of Flexible Joints and Deck on the Seismic Response of Bridges
by: Saleh Salehi Fereidouni, et al.
Published: (2022-04-01)