Critical Chain Project Management Based on a Max-Plus Linear Representation for Determining Time Buffers in Multiple Projects
We propose a framework for describing the Critical Chain Project Management (CCPM) method based on a Max-Plus Linear (MPL) representation for multiple projects. The framework takes into account time buffers in both a single and multi-project environments which play a role for controlling undesirable...
Main Authors: | Nguyen Thi Ngoc TRUC, Hiroyuki GOTO, Hirotaka TAKAHASHI, Shotaro YOSHIDA, Yoshinori TAKEI |
---|---|
Format: | Article |
Language: | English |
Published: |
The Japan Society of Mechanical Engineers
2012-07-01
|
Series: | Journal of Advanced Mechanical Design, Systems, and Manufacturing |
Subjects: | |
Online Access: | https://www.jstage.jst.go.jp/article/jamdsm/6/5/6_715/_pdf/-char/en |
Similar Items
-
Conceptual Validation of Project Based Learning in Buffer Solution
by: Peri Oktiarmi, et al.
Published: (2023-02-01) -
Project Based Practicum Student Worksheet on Buffer Solution Material
by: Klaudius Ware, et al.
Published: (2023-12-01) -
Presentation and Solution of Critical Chain Project
Scheduling Problem (CCPSP) model with consideration
of feeding buffer
by: Akdar Alemtabriz, et al.
Published: (2016-09-01) -
An integrated model for controlling project delays based on the time buffer management approach
by: Seyyed Akbar Gholamian
Published: (2018-12-01) -
New Proactive Time Buffer Heuristics for Robust Project Scheduling
by: Raafat ELSHAER, et al.
Published: (2012-07-01)