PERFORMANCE OF THE PROBABILITY DISTRIBUTIONS FOR PLOTTING POSITIONS IN ESTIMATING THE MAXIMUM DISCHARGES OF ADHAIM RIVER
In this study, the peak discharges of Adhaim River were plotted against their hydrologic years. Two probability distributions and five plotting positions formulas were fitted to the annual maximum discharges AMD. The performances of the probability distributions with plotting position formulas we...
Main Authors: | Abdulwahab M. Younis, Ihsan F. Hasan, Younis N. Saeed |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Engineering, University of Kufa
2020-11-01
|
Series: | Mağallaẗ Al-kūfaẗ Al-handasiyyaẗ |
Subjects: | |
Online Access: | http://journals.uokufa.edu.iq/index.php/kje/article/view/9011 |
Similar Items
-
Regional Conditions for Maximum Probable Discharge in Poland’s Rivers
by: Gutry-Korycka Małgorzata, et al.
Published: (2010-12-01) -
Estimation of the Parameter of an Exponential Distribution When Applying Maximum Likelihood and Probability Plot Methods Using Simulation
by: A.M. Hamad
Published: (2017-05-01) -
Application of the British Columbia MetPortal for Estimation of Probable Maximum Precipitation and Probable Maximum Flood for a Coastal Watershed
by: Leanna M. King, et al.
Published: (2022-03-01) -
Estimating Probable Maximum Precipitation Based on Synoptic Method in Karaj River Basin
by: Afsaneh Abbassi, et al.
Published: (2013-05-01) -
Probability plotting /
by: 296007 Chilko, Daniel M.
Published: (1983)