A Scheduling Model for the Re-entrant Manufacturing System and Its Optimization by NSGA-II
In this study, a two-objective mixed-integer linear programming model (MILP) for multi-product re-entrant flow shop scheduling problem has been designed. As a result, two objectives are considered. One of them is maximization of the production rate and the other is the minimization of processing tim...
Main Authors: | Masoud Rabbani, Safoura Famil Alamdar, Parisa Famil Alamdar |
---|---|
Format: | Article |
Language: | English |
Published: |
Kharazmi University
2016-11-01
|
Series: | International Journal of Supply and Operations Management |
Subjects: | |
Online Access: | http://ijsom.com/article_2712_500.html |
Similar Items
-
Intra-atrial Re-entrant Tachycardia
by: Berardo Sarubbi, et al.
Published: (2003-10-01) -
Metallic Metamaterials with Auxetic Properties: Re-Entrant Structures
by: Julian Plewa, et al.
Published: (2024-11-01) -
Re-Entrant Green Scheduling Problem of Bearing Production Shops Considering Job Reworking
by: Yansen Wang, et al.
Published: (2024-04-01) -
Heuristic algorithms for two-machine re-entrant flowshop scheduling problem with jobs of two classes
by: BongJoo JEONG, et al.
Published: (2017-12-01) -
Photoelasticity as a Tool for Stress Analysis of Re-Entrant Auxetic Structures
by: Barbara Schürger, et al.
Published: (2025-01-01)