PENERAPAN SISTEM MEKANISASI DALAM KEGIATAN PENEBANGAN JATI UNTUK MENGURANGI KETERGANTUNGAN TERBATASNYA PENYEDIAAN TENAGA BLANDONG DI JAWA

Sastrodimedjo, (1975) pointed out that the present trend of wood processing  industry development and formal education of younger  generation  caused some problems,  especially in the sustainabiliy  of forest  worker supply  in Java. Based on this  consideration  an  alternatif   for  most  widely ...

Full description

Bibliographic Details
Main Authors: Maman Mansyur Idris, Soenarno Soenarno
Format: Article
Language:Indonesian
Published: Forest Product Research and Development Center 2017-08-01
Series:Jurnal Penelitian Hasil Hutan (Journal of Forest Products Research)
Online Access:http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3426
_version_ 1819011511901749248
author Maman Mansyur Idris
Soenarno Soenarno
author_facet Maman Mansyur Idris
Soenarno Soenarno
author_sort Maman Mansyur Idris
collection DOAJ
description Sastrodimedjo, (1975) pointed out that the present trend of wood processing  industry development and formal education of younger  generation  caused some problems,  especially in the sustainabiliy  of forest  worker supply  in Java. Based on this  consideration  an  alternatif   for  most  widely  applied  felling  system,   i.e.  manual  felling  system, needs to  be sought. With  regard to this problem a study  was conducted at three Sub Forest District (RPH), namely Temenggeng, Pasar Sore and Sumberogo in Central Java to compare  3 (three)   felling  systems  in teak forest. The result  of  the  study  revealed  that  the  teak  felling  productivity  averages on 2 years gilrded  teak with  mechanical, manual  and  combination systems applied to flat  terrain  were 2.5359 m3/hour,  0.7128  m3/hour and  0.8186 m3/hour, respectively. But   those on hilly terrain were 1.5540 m3/hour, 0.7374 m3/hour and 0.796 m3/hour,   respectively.   The average cost  of  full  mechanical  felling  system applied to flat  terrain  was Rp 1,586.23/m3,  while  that  of on  hilly  terrain was Rp 2,l  65.93/m3
first_indexed 2024-12-21T01:29:20Z
format Article
id doaj.art-8121ff7b313b4f92808f99632956f918
institution Directory Open Access Journal
issn 0216-4329
2442-8957
language Indonesian
last_indexed 2024-12-21T01:29:20Z
publishDate 2017-08-01
publisher Forest Product Research and Development Center
record_format Article
series Jurnal Penelitian Hasil Hutan (Journal of Forest Products Research)
spelling doaj.art-8121ff7b313b4f92808f99632956f9182022-12-21T19:20:25ZindForest Product Research and Development CenterJurnal Penelitian Hasil Hutan (Journal of Forest Products Research)0216-43292442-89572017-08-016847648110.20886/jphh.1990.6.8.476 - 4812421PENERAPAN SISTEM MEKANISASI DALAM KEGIATAN PENEBANGAN JATI UNTUK MENGURANGI KETERGANTUNGAN TERBATASNYA PENYEDIAAN TENAGA BLANDONG DI JAWAMaman Mansyur Idris0Soenarno Soenarno1Pusat Penelitian dan Pengembangan Hasil HutanPusat Penelitian dan Pengembangan Hasil HutanSastrodimedjo, (1975) pointed out that the present trend of wood processing  industry development and formal education of younger  generation  caused some problems,  especially in the sustainabiliy  of forest  worker supply  in Java. Based on this  consideration  an  alternatif   for  most  widely  applied  felling  system,   i.e.  manual  felling  system, needs to  be sought. With  regard to this problem a study  was conducted at three Sub Forest District (RPH), namely Temenggeng, Pasar Sore and Sumberogo in Central Java to compare  3 (three)   felling  systems  in teak forest. The result  of  the  study  revealed  that  the  teak  felling  productivity  averages on 2 years gilrded  teak with  mechanical, manual  and  combination systems applied to flat  terrain  were 2.5359 m3/hour,  0.7128  m3/hour and  0.8186 m3/hour, respectively. But   those on hilly terrain were 1.5540 m3/hour, 0.7374 m3/hour and 0.796 m3/hour,   respectively.   The average cost  of  full  mechanical  felling  system applied to flat  terrain  was Rp 1,586.23/m3,  while  that  of on  hilly  terrain was Rp 2,l  65.93/m3http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3426
spellingShingle Maman Mansyur Idris
Soenarno Soenarno
PENERAPAN SISTEM MEKANISASI DALAM KEGIATAN PENEBANGAN JATI UNTUK MENGURANGI KETERGANTUNGAN TERBATASNYA PENYEDIAAN TENAGA BLANDONG DI JAWA
Jurnal Penelitian Hasil Hutan (Journal of Forest Products Research)
title PENERAPAN SISTEM MEKANISASI DALAM KEGIATAN PENEBANGAN JATI UNTUK MENGURANGI KETERGANTUNGAN TERBATASNYA PENYEDIAAN TENAGA BLANDONG DI JAWA
title_full PENERAPAN SISTEM MEKANISASI DALAM KEGIATAN PENEBANGAN JATI UNTUK MENGURANGI KETERGANTUNGAN TERBATASNYA PENYEDIAAN TENAGA BLANDONG DI JAWA
title_fullStr PENERAPAN SISTEM MEKANISASI DALAM KEGIATAN PENEBANGAN JATI UNTUK MENGURANGI KETERGANTUNGAN TERBATASNYA PENYEDIAAN TENAGA BLANDONG DI JAWA
title_full_unstemmed PENERAPAN SISTEM MEKANISASI DALAM KEGIATAN PENEBANGAN JATI UNTUK MENGURANGI KETERGANTUNGAN TERBATASNYA PENYEDIAAN TENAGA BLANDONG DI JAWA
title_short PENERAPAN SISTEM MEKANISASI DALAM KEGIATAN PENEBANGAN JATI UNTUK MENGURANGI KETERGANTUNGAN TERBATASNYA PENYEDIAAN TENAGA BLANDONG DI JAWA
title_sort penerapan sistem mekanisasi dalam kegiatan penebangan jati untuk mengurangi ketergantungan terbatasnya penyediaan tenaga blandong di jawa
url http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3426
work_keys_str_mv AT mamanmansyuridris penerapansistemmekanisasidalamkegiatanpenebanganjatiuntukmengurangiketergantunganterbatasnyapenyediaantenagablandongdijawa
AT soenarnosoenarno penerapansistemmekanisasidalamkegiatanpenebanganjatiuntukmengurangiketergantunganterbatasnyapenyediaantenagablandongdijawa