Energy-Aware Integrated Scheduling for Quay Crane and IGV in Automated Container Terminal
In this study, we address the integrated scheduling problem involving quay cranes and IGVs in automated terminals. We construct a mixed-integer planning model with the aim of minimizing the total energy consumption during quay crane and IGV operations, focusing on the loading-operation mode. The mod...
Main Authors: | Yuedi Luo, Xiaolei Liang, Yu Zhang, Kexin Tang, Wenting Li |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-02-01
|
Series: | Journal of Marine Science and Engineering |
Subjects: | |
Online Access: | https://www.mdpi.com/2077-1312/12/3/376 |
Similar Items
-
Integrated Scheduling of Automated Yard Cranes and Automated Guided Vehicles with Limited Buffer Capacity of Dual-Trolley Quay Cranes in Automated Container Terminals
by: Doaa Naeem, et al.
Published: (2022-12-01) -
Quay crane scheduling in container terminals
by: Chan, Samson Yan Liang
Published: (2017) -
Traction Load Modeling and Parameter Identification Based on Improved Sparrow Search Algorithm
by: Zhensheng Wu, et al.
Published: (2022-07-01) -
Bi-Objective Integrated Scheduling of Quay Cranes and Automated Guided Vehicles
by: Yating Duan, et al.
Published: (2023-07-01) -
A bounded two-level dynamic programming algorithm for quay crane scheduling in container terminals
by: Huang, Shell Ying, et al.
Published: (2018)