PENINGKATAN PERFORMANCE SYSTEM PADA DEPARTEMEN PACKAGING DENGAN SIMULASI PROSES DAN REDESIGN WORKSTATION (Studi Kasus : CV. Segar Buah Hutama, Batu)
Abstract In running the process, the repetitive activity in the production process of the extract of Dewata fruit could cause pain and fatigue on the worker's body. It was because there was a facility that did not meet the rules of workplace ergonomics. Continuous evaluation was needed to know...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Brawijaya
2015-03-01
|
Series: | Journal of Engineering and Management in Industrial System |
Subjects: | |
Online Access: | https://jemis.ub.ac.id/index.php/jemis/article/view/155 |
_version_ | 1818536869284020224 |
---|---|
author | Nuzullis Lailatul Kamaliyah Sugiono Sugiono Widya Wijayanti |
author_facet | Nuzullis Lailatul Kamaliyah Sugiono Sugiono Widya Wijayanti |
author_sort | Nuzullis Lailatul Kamaliyah |
collection | DOAJ |
description | Abstract In running the process, the repetitive activity in the production process of the extract of Dewata fruit could cause pain and fatigue on the worker's body. It was because there was a facility that did not meet the rules of workplace ergonomics. Continuous evaluation was needed to know the solution of the problem of musculoskeletal complaint so that it can improve ergonomic working facilities. In making simulation scenario is expected to describe the condition of the actual company so that the improvement proposal can resolve the real issue.The methods that were used in this study include: Biomechanics Assessment (REBA and QEC), anthropometric Design and Simulation Arena. Assessment scores REBA (Rapid Entire Body Assessment) was obtained from the angle of motion depiction of the image carrier (photo) whereas the assessment scores QEC (Quick Exposure Check) was obtained from filling the questionnaire between the observer and the operator. From the research result on the dimension repair facility cooling pond work on workstation 2 (cooling), tables and chairs on the workstation 3 (formation of cardboard box), and the table packaging on the workstation 4 (packaging). In the proposal of improved simulation, it is given resource addition as many as one person on cooling 2 to improve production efficiency from 42.3 % to 100 % so that it is necessary to increase the wage of Rp 1,500,000.00 / month. |
first_indexed | 2024-12-11T18:43:29Z |
format | Article |
id | doaj.art-817e4acb8692488cb6f8f22d2663688a |
institution | Directory Open Access Journal |
issn | 2338-3925 2477-6025 |
language | English |
last_indexed | 2024-12-11T18:43:29Z |
publishDate | 2015-03-01 |
publisher | University of Brawijaya |
record_format | Article |
series | Journal of Engineering and Management in Industrial System |
spelling | doaj.art-817e4acb8692488cb6f8f22d2663688a2022-12-22T00:54:32ZengUniversity of BrawijayaJournal of Engineering and Management in Industrial System2338-39252477-60252015-03-013110.21776/ub.jemis.2015.003.01.9143PENINGKATAN PERFORMANCE SYSTEM PADA DEPARTEMEN PACKAGING DENGAN SIMULASI PROSES DAN REDESIGN WORKSTATION (Studi Kasus : CV. Segar Buah Hutama, Batu)Nuzullis Lailatul Kamaliyah0Sugiono Sugiono1Widya Wijayanti2Universitas BrawijayaUniversitas BrawijayaUniversitas BrawijayaAbstract In running the process, the repetitive activity in the production process of the extract of Dewata fruit could cause pain and fatigue on the worker's body. It was because there was a facility that did not meet the rules of workplace ergonomics. Continuous evaluation was needed to know the solution of the problem of musculoskeletal complaint so that it can improve ergonomic working facilities. In making simulation scenario is expected to describe the condition of the actual company so that the improvement proposal can resolve the real issue.The methods that were used in this study include: Biomechanics Assessment (REBA and QEC), anthropometric Design and Simulation Arena. Assessment scores REBA (Rapid Entire Body Assessment) was obtained from the angle of motion depiction of the image carrier (photo) whereas the assessment scores QEC (Quick Exposure Check) was obtained from filling the questionnaire between the observer and the operator. From the research result on the dimension repair facility cooling pond work on workstation 2 (cooling), tables and chairs on the workstation 3 (formation of cardboard box), and the table packaging on the workstation 4 (packaging). In the proposal of improved simulation, it is given resource addition as many as one person on cooling 2 to improve production efficiency from 42.3 % to 100 % so that it is necessary to increase the wage of Rp 1,500,000.00 / month.https://jemis.ub.ac.id/index.php/jemis/article/view/155Design Work FacilityQueing SimulationWork Posture Measurement |
spellingShingle | Nuzullis Lailatul Kamaliyah Sugiono Sugiono Widya Wijayanti PENINGKATAN PERFORMANCE SYSTEM PADA DEPARTEMEN PACKAGING DENGAN SIMULASI PROSES DAN REDESIGN WORKSTATION (Studi Kasus : CV. Segar Buah Hutama, Batu) Journal of Engineering and Management in Industrial System Design Work Facility Queing Simulation Work Posture Measurement |
title | PENINGKATAN PERFORMANCE SYSTEM PADA DEPARTEMEN PACKAGING DENGAN SIMULASI PROSES DAN REDESIGN WORKSTATION (Studi Kasus : CV. Segar Buah Hutama, Batu) |
title_full | PENINGKATAN PERFORMANCE SYSTEM PADA DEPARTEMEN PACKAGING DENGAN SIMULASI PROSES DAN REDESIGN WORKSTATION (Studi Kasus : CV. Segar Buah Hutama, Batu) |
title_fullStr | PENINGKATAN PERFORMANCE SYSTEM PADA DEPARTEMEN PACKAGING DENGAN SIMULASI PROSES DAN REDESIGN WORKSTATION (Studi Kasus : CV. Segar Buah Hutama, Batu) |
title_full_unstemmed | PENINGKATAN PERFORMANCE SYSTEM PADA DEPARTEMEN PACKAGING DENGAN SIMULASI PROSES DAN REDESIGN WORKSTATION (Studi Kasus : CV. Segar Buah Hutama, Batu) |
title_short | PENINGKATAN PERFORMANCE SYSTEM PADA DEPARTEMEN PACKAGING DENGAN SIMULASI PROSES DAN REDESIGN WORKSTATION (Studi Kasus : CV. Segar Buah Hutama, Batu) |
title_sort | peningkatan performance system pada departemen packaging dengan simulasi proses dan redesign workstation studi kasus cv segar buah hutama batu |
topic | Design Work Facility Queing Simulation Work Posture Measurement |
url | https://jemis.ub.ac.id/index.php/jemis/article/view/155 |
work_keys_str_mv | AT nuzullislailatulkamaliyah peningkatanperformancesystempadadepartemenpackagingdengansimulasiprosesdanredesignworkstationstudikasuscvsegarbuahhutamabatu AT sugionosugiono peningkatanperformancesystempadadepartemenpackagingdengansimulasiprosesdanredesignworkstationstudikasuscvsegarbuahhutamabatu AT widyawijayanti peningkatanperformancesystempadadepartemenpackagingdengansimulasiprosesdanredesignworkstationstudikasuscvsegarbuahhutamabatu |