Risk assessment during operating self-propelled lifting jib cranes in conditions of insufficient information
Presents the results of statistical analyses identified by the expert diagnostics of defects of the self-propelled lifting jib cranes, spent a normative term of exploitation. The greatest number of defects associated with the destruction and dete-rioration of structural elements, the occurrence of f...
Main Authors: | Lagerev A.V., Konchits S.V., Bleyshmidt L.I. |
---|---|
Format: | Article |
Language: | deu |
Published: |
Academician I.G. Petrovskii Bryansk State University
2017-06-01
|
Series: | Naučno-Tehničeskij Vestnik Brânskogo Gosudarstvennogo Universiteta |
Subjects: | |
Online Access: | http://ntv-brgu.ru/wp-content/arhiv/2017-N2/2017-02-10.pdf |
Similar Items
-
Determining parameters to optimize the pulling force for the luffing jib tower cranes by Taguchi method
by: Truong Giang Duong
Published: (2023-08-01) -
Multivariate calculation of the lifting mechanism of a bridge-type crane on a computer
by: Vitchuk P.V.
Published: (2023-03-01) -
High pedestal or portal jib cranes
by: 8096 British Standards Institution -
Slewing jib cranes
by: 8096 British Standards Institution -
Jib cranes : ship mounted type
by: 8096 British Standards Institution