Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost

The direct maintenance costs(DMC)is the primary economic index that the aircraft manufacture guarantees to the operator.DMC is regarded as a reference baseline for monitoring and controlling the maintenance expenses during the operating phase of aircraft.In this paper,by considering the guaranteed D...

Full description

Bibliographic Details
Main Authors: LIN Cong, JIANG Qingxi, SU Sizhe, MA Tianran
Format: Article
Language:zho
Published: Editorial Department of Advances in Aeronautical Science and Engineering 2022-12-01
Series:Hangkong gongcheng jinzhan
Subjects:
Online Access:http://hkgcjz.cnjournals.com/hkgcjz/article/abstract/2021226?st=article_issue
_version_ 1811166337311965184
author LIN Cong
JIANG Qingxi
SU Sizhe
MA Tianran
author_facet LIN Cong
JIANG Qingxi
SU Sizhe
MA Tianran
author_sort LIN Cong
collection DOAJ
description The direct maintenance costs(DMC)is the primary economic index that the aircraft manufacture guarantees to the operator.DMC is regarded as a reference baseline for monitoring and controlling the maintenance expenses during the operating phase of aircraft.In this paper,by considering the guaranteed DMC value and the obligated maintenance interval listed in schedule maintenance requirements,an approach to determine the workscope of a preventive maintenance task is put forward.The data items and process for employing the method are introduced.The economic index of a preventive maintenance task is defined and the principle for obtaining the workscope is addressed.The workscope is the interval within which the maintenance expense is regraded as acceptable.To control and optimize the maintenance expense,the aircraft operator can plan to repackage multiple maintenance tasks,if the workscope of them overlaps each other.
first_indexed 2024-04-10T15:51:51Z
format Article
id doaj.art-8397435de961444980386c51368afc91
institution Directory Open Access Journal
issn 1674-8190
language zho
last_indexed 2024-04-10T15:51:51Z
publishDate 2022-12-01
publisher Editorial Department of Advances in Aeronautical Science and Engineering
record_format Article
series Hangkong gongcheng jinzhan
spelling doaj.art-8397435de961444980386c51368afc912023-02-11T05:28:14ZzhoEditorial Department of Advances in Aeronautical Science and EngineeringHangkong gongcheng jinzhan1674-81902022-12-01136808710.16615/j.cnki.1674-8190.2022.06.0820220608Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance CostLIN Cong0JIANG Qingxi1SU Sizhe2MA Tianran3Department of Equipment Services, AVIC China Aero-polytechnology Establishment, Beijing 100028, ChinaDepartment of Equipment Services, AVIC China Aero-polytechnology Establishment, Beijing 100028, ChinaDepartment of Equipment Services, AVIC China Aero-polytechnology Establishment, Beijing 100028, ChinaDepartment of Equipment Services, AVIC China Aero-polytechnology Establishment, Beijing 100028, ChinaThe direct maintenance costs(DMC)is the primary economic index that the aircraft manufacture guarantees to the operator.DMC is regarded as a reference baseline for monitoring and controlling the maintenance expenses during the operating phase of aircraft.In this paper,by considering the guaranteed DMC value and the obligated maintenance interval listed in schedule maintenance requirements,an approach to determine the workscope of a preventive maintenance task is put forward.The data items and process for employing the method are introduced.The economic index of a preventive maintenance task is defined and the principle for obtaining the workscope is addressed.The workscope is the interval within which the maintenance expense is regraded as acceptable.To control and optimize the maintenance expense,the aircraft operator can plan to repackage multiple maintenance tasks,if the workscope of them overlaps each other.http://hkgcjz.cnjournals.com/hkgcjz/article/abstract/2021226?st=article_issuedirect maintenance costmaintenance task intervalmaintenance task workscopeschedule maintenance requirement
spellingShingle LIN Cong
JIANG Qingxi
SU Sizhe
MA Tianran
Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost
Hangkong gongcheng jinzhan
direct maintenance cost
maintenance task interval
maintenance task workscope
schedule maintenance requirement
title Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost
title_full Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost
title_fullStr Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost
title_full_unstemmed Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost
title_short Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost
title_sort approach for determining the workscope of the preventive maintenance tasks by considering direct maintenance cost
topic direct maintenance cost
maintenance task interval
maintenance task workscope
schedule maintenance requirement
url http://hkgcjz.cnjournals.com/hkgcjz/article/abstract/2021226?st=article_issue
work_keys_str_mv AT lincong approachfordeterminingtheworkscopeofthepreventivemaintenancetasksbyconsideringdirectmaintenancecost
AT jiangqingxi approachfordeterminingtheworkscopeofthepreventivemaintenancetasksbyconsideringdirectmaintenancecost
AT susizhe approachfordeterminingtheworkscopeofthepreventivemaintenancetasksbyconsideringdirectmaintenancecost
AT matianran approachfordeterminingtheworkscopeofthepreventivemaintenancetasksbyconsideringdirectmaintenancecost