Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost
The direct maintenance costs(DMC)is the primary economic index that the aircraft manufacture guarantees to the operator.DMC is regarded as a reference baseline for monitoring and controlling the maintenance expenses during the operating phase of aircraft.In this paper,by considering the guaranteed D...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Advances in Aeronautical Science and Engineering
2022-12-01
|
Series: | Hangkong gongcheng jinzhan |
Subjects: | |
Online Access: | http://hkgcjz.cnjournals.com/hkgcjz/article/abstract/2021226?st=article_issue |
_version_ | 1811166337311965184 |
---|---|
author | LIN Cong JIANG Qingxi SU Sizhe MA Tianran |
author_facet | LIN Cong JIANG Qingxi SU Sizhe MA Tianran |
author_sort | LIN Cong |
collection | DOAJ |
description | The direct maintenance costs(DMC)is the primary economic index that the aircraft manufacture guarantees to the operator.DMC is regarded as a reference baseline for monitoring and controlling the maintenance expenses during the operating phase of aircraft.In this paper,by considering the guaranteed DMC value and the obligated maintenance interval listed in schedule maintenance requirements,an approach to determine the workscope of a preventive maintenance task is put forward.The data items and process for employing the method are introduced.The economic index of a preventive maintenance task is defined and the principle for obtaining the workscope is addressed.The workscope is the interval within which the maintenance expense is regraded as acceptable.To control and optimize the maintenance expense,the aircraft operator can plan to repackage multiple maintenance tasks,if the workscope of them overlaps each other. |
first_indexed | 2024-04-10T15:51:51Z |
format | Article |
id | doaj.art-8397435de961444980386c51368afc91 |
institution | Directory Open Access Journal |
issn | 1674-8190 |
language | zho |
last_indexed | 2024-04-10T15:51:51Z |
publishDate | 2022-12-01 |
publisher | Editorial Department of Advances in Aeronautical Science and Engineering |
record_format | Article |
series | Hangkong gongcheng jinzhan |
spelling | doaj.art-8397435de961444980386c51368afc912023-02-11T05:28:14ZzhoEditorial Department of Advances in Aeronautical Science and EngineeringHangkong gongcheng jinzhan1674-81902022-12-01136808710.16615/j.cnki.1674-8190.2022.06.0820220608Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance CostLIN Cong0JIANG Qingxi1SU Sizhe2MA Tianran3Department of Equipment Services, AVIC China Aero-polytechnology Establishment, Beijing 100028, ChinaDepartment of Equipment Services, AVIC China Aero-polytechnology Establishment, Beijing 100028, ChinaDepartment of Equipment Services, AVIC China Aero-polytechnology Establishment, Beijing 100028, ChinaDepartment of Equipment Services, AVIC China Aero-polytechnology Establishment, Beijing 100028, ChinaThe direct maintenance costs(DMC)is the primary economic index that the aircraft manufacture guarantees to the operator.DMC is regarded as a reference baseline for monitoring and controlling the maintenance expenses during the operating phase of aircraft.In this paper,by considering the guaranteed DMC value and the obligated maintenance interval listed in schedule maintenance requirements,an approach to determine the workscope of a preventive maintenance task is put forward.The data items and process for employing the method are introduced.The economic index of a preventive maintenance task is defined and the principle for obtaining the workscope is addressed.The workscope is the interval within which the maintenance expense is regraded as acceptable.To control and optimize the maintenance expense,the aircraft operator can plan to repackage multiple maintenance tasks,if the workscope of them overlaps each other.http://hkgcjz.cnjournals.com/hkgcjz/article/abstract/2021226?st=article_issuedirect maintenance costmaintenance task intervalmaintenance task workscopeschedule maintenance requirement |
spellingShingle | LIN Cong JIANG Qingxi SU Sizhe MA Tianran Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost Hangkong gongcheng jinzhan direct maintenance cost maintenance task interval maintenance task workscope schedule maintenance requirement |
title | Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost |
title_full | Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost |
title_fullStr | Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost |
title_full_unstemmed | Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost |
title_short | Approach for Determining the Workscope of the Preventive Maintenance Tasks by Considering Direct Maintenance Cost |
title_sort | approach for determining the workscope of the preventive maintenance tasks by considering direct maintenance cost |
topic | direct maintenance cost maintenance task interval maintenance task workscope schedule maintenance requirement |
url | http://hkgcjz.cnjournals.com/hkgcjz/article/abstract/2021226?st=article_issue |
work_keys_str_mv | AT lincong approachfordeterminingtheworkscopeofthepreventivemaintenancetasksbyconsideringdirectmaintenancecost AT jiangqingxi approachfordeterminingtheworkscopeofthepreventivemaintenancetasksbyconsideringdirectmaintenancecost AT susizhe approachfordeterminingtheworkscopeofthepreventivemaintenancetasksbyconsideringdirectmaintenancecost AT matianran approachfordeterminingtheworkscopeofthepreventivemaintenancetasksbyconsideringdirectmaintenancecost |