Research on cost prediction for construction project based on Boruta-SO-BP model
Cost prediction for construction projects provides important information for project feasibility studies and design scheme selection. To improve the accuracy of early-stage cost estimation for construction projects, an improved neural network prediction model was proposed based on BP (back propagati...
Main Authors: | Hao Cui, Junjie Xia |
---|---|
Format: | Article |
Language: | English |
Published: |
Polish Academy of Sciences
2023-12-01
|
Series: | Archives of Civil Engineering |
Subjects: | |
Online Access: | https://journals.pan.pl/Content/129781/PDF/art24_int.pdf |
Similar Items
-
The Meaning of Existence and Art in the Painting Pieta by Tadeusz Boruta
by: Michał Haake
Published: (2012-06-01) -
Evaluation of Boruta algorithm in DDoS detection
by: Noor Farhana, et al.
Published: (2023-03-01) -
Influencing factors of occupational injury in construction workers of European Union based on Boruta algorithm and logistic regression
by: Zhian LI, et al.
Published: (2025-02-01) -
LSSA-BP-based cost forecasting for onshore wind power
by: Ren Feng, et al.
Published: (2023-12-01) -
PISA 2018 Türkiye Örnekleminde Okuma Becerisini Etkileyen Değişkenlerin Boruta Algoritması ile Belirlenmesi
by: Sanem Şehribanoğlu
Published: (2024-07-01)