Methodology for construction-standard-production-rate-based simulation modeling and production-rate data generation
While implementing a construction project, production-rate assessment needs to be conducted throughout the different stages of the project because this assessment can determine the success or failure of the project. In South Korea, the construction-standard-production-rate (CSPR) is used for determi...
Main Authors: | Yongho Ko, Yujin Kim, Jaeyun Noh, Kanghyeok Lee, Dohyoung Shin, Seungwoo Han |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2024-03-01
|
Series: | Journal of Asian Architecture and Building Engineering |
Subjects: | |
Online Access: | http://dx.doi.org/10.1080/13467581.2023.2278885 |
Similar Items
-
Fleet management for earthmoving operation in the phase of detail estimation using mixed integer nonlinear programming
by: Kheang Ngov, et al.
Published: (2024-03-01) -
Production Improvement Rate with Time Series Data on Standard Time at Manufacturing Sites
by: Injong Ki, et al.
Published: (2023-10-01) -
Impact of COVID-19 on Construction Production Rate
by: Doaa H. Amien, et al.
Published: (2023-04-01) -
A relationship between productivity and significant controlling factors of highway construction earthwork
by: Ermias Amede
Published: (2022-12-01) -
Product rating statistics as consumer search aids
by: Guan, Chong, et al.
Published: (2020)