Simulator Berbasis PLC untuk Pengaturan Lalu-lintas Jalan Raya pada Perlintasan Jalur Kapal

A PLC based simulator has been assembled for controlling road traffic at ship line crossings. The objectives of this study include (i) assembling a miniature bridge body, a lift-drop back mechanism for highway traffic at ship crossings, and an operating system based on a programmable logic controlle...

Full description

Bibliographic Details
Main Authors: Arief Goeritno, Sandi Tirta
Format: Article
Language:English
Published: Ikatan Ahli Informatika Indonesia 2020-12-01
Series:Jurnal RESTI (Rekayasa Sistem dan Teknologi Informasi)
Subjects:
Online Access:http://jurnal.iaii.or.id/index.php/RESTI/article/view/2668
_version_ 1797334416089939968
author Arief Goeritno
Sandi Tirta
author_facet Arief Goeritno
Sandi Tirta
author_sort Arief Goeritno
collection DOAJ
description A PLC based simulator has been assembled for controlling road traffic at ship line crossings. The objectives of this study include (i) assembling a miniature bridge body, a lift-drop back mechanism for highway traffic at ship crossings, and an operating system based on a programmable logic controller (PLC) and (ii) measuring the performance of the operating system through its presence input-output signal. Assembly with the following stages: (i) implementation of miniature bridge construction; (ii) selection and placement of sensors; (iii) installation of pumps for hydraulic systems; (iv) installation of servo motor assisted latches; (v) installation of traffic control lights and indicators; and (vi) manufacture of operation panels, wiring, and installation of PLC systems. Mitsubishi PLC system programming is based on compiling algorithms and ladder diagrams with GX Works-2 32 bit. Performance measurement includes (i) when synchronization between the operating system and control on the PLC in the form of input from the operation panel and sensors on the input line are processed in the PLC program to produce an output in the form of appropriate and precise control, (ii) when the sensors installed in the system operation has functioned as programmed into the PLC, and (iii) during the process of lifting and lowering the miniature of the bridge body, there is a time difference of 26 seconds with the condition that the lifting time is longer than the time of lowering the miniature bridge body. The general conclusion is that the miniature of the bridge body and the operating system that has been built can be used as a simulator for the existence of a bridge that can be lifted and lowered again as a highway traffic lane at a ship crossing.
first_indexed 2024-03-08T08:20:25Z
format Article
id doaj.art-84cf4ea50a574d2182afaa0715e41586
institution Directory Open Access Journal
issn 2580-0760
language English
last_indexed 2024-03-08T08:20:25Z
publishDate 2020-12-01
publisher Ikatan Ahli Informatika Indonesia
record_format Article
series Jurnal RESTI (Rekayasa Sistem dan Teknologi Informasi)
spelling doaj.art-84cf4ea50a574d2182afaa0715e415862024-02-02T06:20:24ZengIkatan Ahli Informatika IndonesiaJurnal RESTI (Rekayasa Sistem dan Teknologi Informasi)2580-07602020-12-01461007101610.29207/resti.v4i6.26682668Simulator Berbasis PLC untuk Pengaturan Lalu-lintas Jalan Raya pada Perlintasan Jalur KapalArief Goeritno0Sandi Tirta1Electrical Engineering Study Program, UIKA Bogor, INDONESIAMuseum Kepresidenan Balai KirtiA PLC based simulator has been assembled for controlling road traffic at ship line crossings. The objectives of this study include (i) assembling a miniature bridge body, a lift-drop back mechanism for highway traffic at ship crossings, and an operating system based on a programmable logic controller (PLC) and (ii) measuring the performance of the operating system through its presence input-output signal. Assembly with the following stages: (i) implementation of miniature bridge construction; (ii) selection and placement of sensors; (iii) installation of pumps for hydraulic systems; (iv) installation of servo motor assisted latches; (v) installation of traffic control lights and indicators; and (vi) manufacture of operation panels, wiring, and installation of PLC systems. Mitsubishi PLC system programming is based on compiling algorithms and ladder diagrams with GX Works-2 32 bit. Performance measurement includes (i) when synchronization between the operating system and control on the PLC in the form of input from the operation panel and sensors on the input line are processed in the PLC program to produce an output in the form of appropriate and precise control, (ii) when the sensors installed in the system operation has functioned as programmed into the PLC, and (iii) during the process of lifting and lowering the miniature of the bridge body, there is a time difference of 26 seconds with the condition that the lifting time is longer than the time of lowering the miniature bridge body. The general conclusion is that the miniature of the bridge body and the operating system that has been built can be used as a simulator for the existence of a bridge that can be lifted and lowered again as a highway traffic lane at a ship crossing.http://jurnal.iaii.or.id/index.php/RESTI/article/view/2668analogi perlintasan jalur kapalminiatur badan jembatanpengaturan lalu-lintas jalan rayasistem pengoperasian berbasis programmable logic controller
spellingShingle Arief Goeritno
Sandi Tirta
Simulator Berbasis PLC untuk Pengaturan Lalu-lintas Jalan Raya pada Perlintasan Jalur Kapal
Jurnal RESTI (Rekayasa Sistem dan Teknologi Informasi)
analogi perlintasan jalur kapal
miniatur badan jembatan
pengaturan lalu-lintas jalan raya
sistem pengoperasian berbasis programmable logic controller
title Simulator Berbasis PLC untuk Pengaturan Lalu-lintas Jalan Raya pada Perlintasan Jalur Kapal
title_full Simulator Berbasis PLC untuk Pengaturan Lalu-lintas Jalan Raya pada Perlintasan Jalur Kapal
title_fullStr Simulator Berbasis PLC untuk Pengaturan Lalu-lintas Jalan Raya pada Perlintasan Jalur Kapal
title_full_unstemmed Simulator Berbasis PLC untuk Pengaturan Lalu-lintas Jalan Raya pada Perlintasan Jalur Kapal
title_short Simulator Berbasis PLC untuk Pengaturan Lalu-lintas Jalan Raya pada Perlintasan Jalur Kapal
title_sort simulator berbasis plc untuk pengaturan lalu lintas jalan raya pada perlintasan jalur kapal
topic analogi perlintasan jalur kapal
miniatur badan jembatan
pengaturan lalu-lintas jalan raya
sistem pengoperasian berbasis programmable logic controller
url http://jurnal.iaii.or.id/index.php/RESTI/article/view/2668
work_keys_str_mv AT ariefgoeritno simulatorberbasisplcuntukpengaturanlalulintasjalanrayapadaperlintasanjalurkapal
AT sanditirta simulatorberbasisplcuntukpengaturanlalulintasjalanrayapadaperlintasanjalurkapal