The impact of changes in the geological conditions of road bedrock layers while the road was in use

This article examines the effective road reconstruction technologies applied during construction processes to ensure the required final quality of construction work. The construction quality and especially the overall levelness of roads are influenced by several factors. These factors include high-q...

Full description

Bibliographic Details
Main Authors: Smugala Stanislav, Kubečková Darja, Indra František
Format: Article
Language:English
Published: Sciendo 2019-11-01
Series:Organization, Technology and Management in Construction: An International Journal
Subjects:
Online Access:https://doi.org/10.2478/otmcj-2019-0008
_version_ 1797861973619113984
author Smugala Stanislav
Kubečková Darja
Indra František
author_facet Smugala Stanislav
Kubečková Darja
Indra František
author_sort Smugala Stanislav
collection DOAJ
description This article examines the effective road reconstruction technologies applied during construction processes to ensure the required final quality of construction work. The construction quality and especially the overall levelness of roads are influenced by several factors. These factors include high-quality implementation of road structural layers, including active zones, which can be adversely affected by the undisciplined application of technology, insufficient engineering and poor geological surveys. Suitable and effective reconstruction technology provides the required quality of construction work yet does not significantly extend construction time. The authors propose stabilisation using cement or lime during reconstruction. This stabilisation method is used if the structure of the bedrock layers is finely granular. The stabilisation process consists of excavating the unacceptable bedrock layer and mixing it with additives and water. A principally different bedrock stabilisation method consists of completely replacing it with a gravel layer, which is used when individual base layers are diverse and stabilisation using additives would not guarantee the required results, i.e. improved strength characteristics. In some cases, the existing base layers are not suitable for use as road base layers because of their characteristics, such as volumetric instability. For this reason, they must be replaced with more suitable materials. This topic is documented by a practical example.
first_indexed 2024-04-09T22:11:51Z
format Article
id doaj.art-85a60405471f42669084b417be9e8297
institution Directory Open Access Journal
issn 1847-6228
language English
last_indexed 2024-04-09T22:11:51Z
publishDate 2019-11-01
publisher Sciendo
record_format Article
series Organization, Technology and Management in Construction: An International Journal
spelling doaj.art-85a60405471f42669084b417be9e82972023-03-23T07:45:45ZengSciendoOrganization, Technology and Management in Construction: An International Journal1847-62282019-11-011112009202110.2478/otmcj-2019-0008otmcj-2019-0008The impact of changes in the geological conditions of road bedrock layers while the road was in useSmugala Stanislav0Kubečková Darja1Indra František2Faculty of Civil Engineering, Department of Construction, VSB – Technical University of Ostrava, L. Podéště 1875, 708 33 Ostrava-Poruba, Czech RepublicFaculty of Civil Engineering, Department of Construction, VSB – Technical University of Ostrava, L. Podéště 1875, 708 33 Ostrava-Poruba, Czech RepublicSAFETY PRO s.r.o., Rudná 1117/30a, 703 00Ostrava, Vítkovice, Czech RepublicThis article examines the effective road reconstruction technologies applied during construction processes to ensure the required final quality of construction work. The construction quality and especially the overall levelness of roads are influenced by several factors. These factors include high-quality implementation of road structural layers, including active zones, which can be adversely affected by the undisciplined application of technology, insufficient engineering and poor geological surveys. Suitable and effective reconstruction technology provides the required quality of construction work yet does not significantly extend construction time. The authors propose stabilisation using cement or lime during reconstruction. This stabilisation method is used if the structure of the bedrock layers is finely granular. The stabilisation process consists of excavating the unacceptable bedrock layer and mixing it with additives and water. A principally different bedrock stabilisation method consists of completely replacing it with a gravel layer, which is used when individual base layers are diverse and stabilisation using additives would not guarantee the required results, i.e. improved strength characteristics. In some cases, the existing base layers are not suitable for use as road base layers because of their characteristics, such as volumetric instability. For this reason, they must be replaced with more suitable materials. This topic is documented by a practical example.https://doi.org/10.2478/otmcj-2019-0008constructionroadtechnologyqualityreconstruction
spellingShingle Smugala Stanislav
Kubečková Darja
Indra František
The impact of changes in the geological conditions of road bedrock layers while the road was in use
Organization, Technology and Management in Construction: An International Journal
construction
road
technology
quality
reconstruction
title The impact of changes in the geological conditions of road bedrock layers while the road was in use
title_full The impact of changes in the geological conditions of road bedrock layers while the road was in use
title_fullStr The impact of changes in the geological conditions of road bedrock layers while the road was in use
title_full_unstemmed The impact of changes in the geological conditions of road bedrock layers while the road was in use
title_short The impact of changes in the geological conditions of road bedrock layers while the road was in use
title_sort impact of changes in the geological conditions of road bedrock layers while the road was in use
topic construction
road
technology
quality
reconstruction
url https://doi.org/10.2478/otmcj-2019-0008
work_keys_str_mv AT smugalastanislav theimpactofchangesinthegeologicalconditionsofroadbedrocklayerswhiletheroadwasinuse
AT kubeckovadarja theimpactofchangesinthegeologicalconditionsofroadbedrocklayerswhiletheroadwasinuse
AT indrafrantisek theimpactofchangesinthegeologicalconditionsofroadbedrocklayerswhiletheroadwasinuse
AT smugalastanislav impactofchangesinthegeologicalconditionsofroadbedrocklayerswhiletheroadwasinuse
AT kubeckovadarja impactofchangesinthegeologicalconditionsofroadbedrocklayerswhiletheroadwasinuse
AT indrafrantisek impactofchangesinthegeologicalconditionsofroadbedrocklayerswhiletheroadwasinuse