Dynamic Optimization of Construction Time-Cost for Deep and Large Foundation Pit Based on BIM Technology and Genetic Algorithm

With the increasingly fierce market competition, optimizing the construction time-cost of deep and large foundation pit construction projects has become one of the key factors for construction enterprises to remain invincible. By dynamically optimizing the time-cost, the optimal time corresponding t...

Full description

Bibliographic Details
Main Authors: Yingxia Yu, Junjia Han, Haoyu Gu, Yi Yang
Format: Article
Language:English
Published: MDPI AG 2023-09-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/13/19/10716
_version_ 1797576254344396800
author Yingxia Yu
Junjia Han
Haoyu Gu
Yi Yang
author_facet Yingxia Yu
Junjia Han
Haoyu Gu
Yi Yang
author_sort Yingxia Yu
collection DOAJ
description With the increasingly fierce market competition, optimizing the construction time-cost of deep and large foundation pit construction projects has become one of the key factors for construction enterprises to remain invincible. By dynamically optimizing the time-cost, the optimal time corresponding to the lowest engineering cost can be found. Based on a comprehensive transportation hub project, considering the time value of capital and the reward and punishment of construction time, a time-cost dynamic optimization model is constructed. Relying on BIM technology, the feasibility of construction plan is analyzed from both qualitative and quantitative perspectives, and the project parameters and resource information is obtained accurately and quickly. Using the MATLAB program, time-cost optimization based on genetic algorithm is carried out, and the static and dynamic optimization results are compared. The results show that the dynamic optimization scheme reduces the total cost by 1.68% while reducing the total construction time by 8.47%. The dynamic optimization scheme extends the construction period by 2 days while reducing the total cost by 89,500 yuan compared to static optimization. The peak value of the fund demand curve before and after optimization has decreased from 128,000 yuan to 127,000 yuan. The time-cost dynamic optimization, considering the time value of capital is more in line with engineering reality, and the optimization results are more reliable and accurate. BIM technology can accurately and quickly obtain project parameters and resource information, solving problems such as complex processes in super deep excavation and huge engineering data statistics. The genetic algorithm can efficiently and accurately search for the optimal solution within the global domain. This study combines BIM technology with the genetic algorithm to solve the dynamic optimization problem of construction period cost for deep and large foundation pits. The research results of this study provide a theoretical reference for the optimization of schedule cost for similar projects.
first_indexed 2024-03-10T21:49:41Z
format Article
id doaj.art-869cb88d92af489091defe51df98a5b1
institution Directory Open Access Journal
issn 2076-3417
language English
last_indexed 2024-03-10T21:49:41Z
publishDate 2023-09-01
publisher MDPI AG
record_format Article
series Applied Sciences
spelling doaj.art-869cb88d92af489091defe51df98a5b12023-11-19T14:03:14ZengMDPI AGApplied Sciences2076-34172023-09-0113191071610.3390/app131910716Dynamic Optimization of Construction Time-Cost for Deep and Large Foundation Pit Based on BIM Technology and Genetic AlgorithmYingxia Yu0Junjia Han1Haoyu Gu2Yi Yang3School of Civil Engineering and Architecture, Henan University of Science and Technology, Luoyang 471000, ChinaSchool of Mechanical, Electrical & Information Engineering, Shandong University, Weihai 264209, ChinaSchool of Civil Engineering and Architecture, Henan University of Science and Technology, Luoyang 471000, ChinaChina Railway 19th Bureau Group Co., Ltd., Beijing 100176, ChinaWith the increasingly fierce market competition, optimizing the construction time-cost of deep and large foundation pit construction projects has become one of the key factors for construction enterprises to remain invincible. By dynamically optimizing the time-cost, the optimal time corresponding to the lowest engineering cost can be found. Based on a comprehensive transportation hub project, considering the time value of capital and the reward and punishment of construction time, a time-cost dynamic optimization model is constructed. Relying on BIM technology, the feasibility of construction plan is analyzed from both qualitative and quantitative perspectives, and the project parameters and resource information is obtained accurately and quickly. Using the MATLAB program, time-cost optimization based on genetic algorithm is carried out, and the static and dynamic optimization results are compared. The results show that the dynamic optimization scheme reduces the total cost by 1.68% while reducing the total construction time by 8.47%. The dynamic optimization scheme extends the construction period by 2 days while reducing the total cost by 89,500 yuan compared to static optimization. The peak value of the fund demand curve before and after optimization has decreased from 128,000 yuan to 127,000 yuan. The time-cost dynamic optimization, considering the time value of capital is more in line with engineering reality, and the optimization results are more reliable and accurate. BIM technology can accurately and quickly obtain project parameters and resource information, solving problems such as complex processes in super deep excavation and huge engineering data statistics. The genetic algorithm can efficiently and accurately search for the optimal solution within the global domain. This study combines BIM technology with the genetic algorithm to solve the dynamic optimization problem of construction period cost for deep and large foundation pits. The research results of this study provide a theoretical reference for the optimization of schedule cost for similar projects.https://www.mdpi.com/2076-3417/13/19/10716super and deep foundation pitBIMgenetic algorithmdynamic optimization
spellingShingle Yingxia Yu
Junjia Han
Haoyu Gu
Yi Yang
Dynamic Optimization of Construction Time-Cost for Deep and Large Foundation Pit Based on BIM Technology and Genetic Algorithm
Applied Sciences
super and deep foundation pit
BIM
genetic algorithm
dynamic optimization
title Dynamic Optimization of Construction Time-Cost for Deep and Large Foundation Pit Based on BIM Technology and Genetic Algorithm
title_full Dynamic Optimization of Construction Time-Cost for Deep and Large Foundation Pit Based on BIM Technology and Genetic Algorithm
title_fullStr Dynamic Optimization of Construction Time-Cost for Deep and Large Foundation Pit Based on BIM Technology and Genetic Algorithm
title_full_unstemmed Dynamic Optimization of Construction Time-Cost for Deep and Large Foundation Pit Based on BIM Technology and Genetic Algorithm
title_short Dynamic Optimization of Construction Time-Cost for Deep and Large Foundation Pit Based on BIM Technology and Genetic Algorithm
title_sort dynamic optimization of construction time cost for deep and large foundation pit based on bim technology and genetic algorithm
topic super and deep foundation pit
BIM
genetic algorithm
dynamic optimization
url https://www.mdpi.com/2076-3417/13/19/10716
work_keys_str_mv AT yingxiayu dynamicoptimizationofconstructiontimecostfordeepandlargefoundationpitbasedonbimtechnologyandgeneticalgorithm
AT junjiahan dynamicoptimizationofconstructiontimecostfordeepandlargefoundationpitbasedonbimtechnologyandgeneticalgorithm
AT haoyugu dynamicoptimizationofconstructiontimecostfordeepandlargefoundationpitbasedonbimtechnologyandgeneticalgorithm
AT yiyang dynamicoptimizationofconstructiontimecostfordeepandlargefoundationpitbasedonbimtechnologyandgeneticalgorithm