Longwall surface subsidence control by technology of isolated overburden grout injection

Surface subsidence is a typical ground movement due to longwall mining, which causes a series of environmental problems and hazards. In China, intensive coal extractions are commonly operated under dense-populated coalfields, which exacerbates the negative subsequences resulted from surface settleme...

Full description

Bibliographic Details
Main Authors: Dayang Xuan, Jialin Xu
Format: Article
Language:English
Published: Elsevier 2017-09-01
Series:International Journal of Mining Science and Technology
Online Access:http://www.sciencedirect.com/science/article/pii/S2095268617305773
_version_ 1818512813972258816
author Dayang Xuan
Jialin Xu
author_facet Dayang Xuan
Jialin Xu
author_sort Dayang Xuan
collection DOAJ
description Surface subsidence is a typical ground movement due to longwall mining, which causes a series of environmental problems and hazards. In China, intensive coal extractions are commonly operated under dense-populated coalfields, which exacerbates the negative subsequences resulted from surface settlement. Therefore, effective approaches to control the ground subsidence are in urgent need for the Chinese coal mining industry. This paper presents a newly developed subsidence control technology: isolated overburden grout injection, including the theory, technique and applications. Relevant procedures such as injection system design, grouting material selection, borehole layout, grout take estimation and injection process design are proposed. The applicability of this technology has been demonstrated through physical modelling, field measurements, and case studies. Since 2009, the technology has been successfully applied to 14 longwall areas in 9 Chinese coal mines. The ultimate surface subsidence factors vary from 0.10 to 0.15. This method has a great potential to be popularized and performed where longwall mining are implemented under villages and ground infrastructures. Keywords: Longwall mining, Subsidence control, Isolated overburden grout injection, Green mining
first_indexed 2024-12-10T23:52:20Z
format Article
id doaj.art-86cc59324b104f22b55d093562ae3979
institution Directory Open Access Journal
issn 2095-2686
language English
last_indexed 2024-12-10T23:52:20Z
publishDate 2017-09-01
publisher Elsevier
record_format Article
series International Journal of Mining Science and Technology
spelling doaj.art-86cc59324b104f22b55d093562ae39792022-12-22T01:28:43ZengElsevierInternational Journal of Mining Science and Technology2095-26862017-09-01275813818Longwall surface subsidence control by technology of isolated overburden grout injectionDayang Xuan0Jialin Xu1Corresponding author.; State Key Laboratory of Coal Resources and Safe Mining, China University of Mining & Technology, Xuzhou 221116, ChinaState Key Laboratory of Coal Resources and Safe Mining, China University of Mining & Technology, Xuzhou 221116, ChinaSurface subsidence is a typical ground movement due to longwall mining, which causes a series of environmental problems and hazards. In China, intensive coal extractions are commonly operated under dense-populated coalfields, which exacerbates the negative subsequences resulted from surface settlement. Therefore, effective approaches to control the ground subsidence are in urgent need for the Chinese coal mining industry. This paper presents a newly developed subsidence control technology: isolated overburden grout injection, including the theory, technique and applications. Relevant procedures such as injection system design, grouting material selection, borehole layout, grout take estimation and injection process design are proposed. The applicability of this technology has been demonstrated through physical modelling, field measurements, and case studies. Since 2009, the technology has been successfully applied to 14 longwall areas in 9 Chinese coal mines. The ultimate surface subsidence factors vary from 0.10 to 0.15. This method has a great potential to be popularized and performed where longwall mining are implemented under villages and ground infrastructures. Keywords: Longwall mining, Subsidence control, Isolated overburden grout injection, Green mininghttp://www.sciencedirect.com/science/article/pii/S2095268617305773
spellingShingle Dayang Xuan
Jialin Xu
Longwall surface subsidence control by technology of isolated overburden grout injection
International Journal of Mining Science and Technology
title Longwall surface subsidence control by technology of isolated overburden grout injection
title_full Longwall surface subsidence control by technology of isolated overburden grout injection
title_fullStr Longwall surface subsidence control by technology of isolated overburden grout injection
title_full_unstemmed Longwall surface subsidence control by technology of isolated overburden grout injection
title_short Longwall surface subsidence control by technology of isolated overburden grout injection
title_sort longwall surface subsidence control by technology of isolated overburden grout injection
url http://www.sciencedirect.com/science/article/pii/S2095268617305773
work_keys_str_mv AT dayangxuan longwallsurfacesubsidencecontrolbytechnologyofisolatedoverburdengroutinjection
AT jialinxu longwallsurfacesubsidencecontrolbytechnologyofisolatedoverburdengroutinjection